# How to calculate daily noise exposure

> Why 3 dB more is twice the noise, how tasks add up to one person’s daily dB(A), and what 80, 85 and 87 ask. One kerb-laying day, worked through.
> Web page: https://complyonsite.com/guides/calculate-noise-exposure

Ten minutes of cutting is 75% of this groundworker’s noise for the day.

1. **Digging** 85 dB(A), 3 h
2. **Saw cutting** 109 dB(A), 10 min
3. **Compactor** 95 dB(A), 1 h
4. **Laying** 80 dB(A), 2 h

**Lesson figures, not measurements.** HSE measured two petrol cut-off saws cutting paving slabs at 108.6 and 109.8 dB(A) at the operator’s ear. [The lesson day](https://complyonsite.com/guides/calculate-noise-exposure#lesson-day)

By the clock 6 h 10 min

Digging Compactor Laying

By noise 694 points

Saw cutting Compactor

**93 dB(A)**for the day. The saw is 75% of it.

1. **Note each task’s noise level in dB(A) and how long it lasts.**
2. **Turn each into points and add them.** 100 points is 85 dB(A) for the day.
3. **Turn the total back into dB(A)** and compare it with 80 and 85. The 87 limit is checked at the ear.

## [Every 3 dB doubles the noise](https://complyonsite.com/guides/calculate-noise-exposure#3-db)

**3 dB more is twice the noise energy, so the same dose comes in half the time.** 85 dB(A) takes a full 8-hour day to reach 85. At 109 it takes under 2 min.

A 3 dB change is about the smallest the ear notices, which is why the numbers look closer than the noise is.

From [HSE, Noise: advice overview](https://www.hse.gov.uk/noise/advice-overview.htm) and [HSE, Daily exposure ready-reckoner](https://www.hse.gov.uk/noise/assets/docs/dailyexposure.pdf).

**85** dB(A)Digging

Noise energy. One square is 85 dB(A).

**The same** as 85 dB(A)

Time to reach 85 dB(A) for the day

**8 hours**

85 dB(A): the same noise energy as 85, reaching 85 dB(A) for the day in about 8 h.

Time at each level to reach 85 dB(A) for the day

| dB(A) | 85 | 88 | 91 | 94 | 97 | 100 |
| --- | --- | --- | --- | --- | --- | --- |
| Time | **8 h** | **4 h** | **2 h** | **1 h** | **30 min** | **15 min** |

Each pair is 100 points in HSE’s ready-reckoner.

## [Add the points, not the decibels](https://complyonsite.com/guides/calculate-noise-exposure#add-up-the-day)

**Turn each task into points, add them, then turn the total back into dB(A).** Points add like ordinary numbers. Decibels don’t.

Averaging the decibels over the time says 86 dB(A).Adding the points says **93 dB(A)**.

The average hides the saw. The points show it: one steep climb in ten minutes.

**15:30** 694 points

The lesson day, one groundworker laying a kerb line

| Task | Level | Time | Points |
| --- | --- | --- | --- |
| Dig the bed beside the excavator | 85 dB(A) | 3 h | **38** |
| Cut kerbs with a petrol cut-off saw | 109 dB(A) | 10 min cutting | **523** |
| Compact the base with a plate compactor | 95 dB(A) | 1 h | **125** |
| Lay and bed the kerbs | 80 dB(A) | 2 h | **8** |
| The day | 93 dB(A) | 6 h 10 min | **694** |

**The sums**

Points = 100 × (hours ÷ 8) × 10(dB(A) − 85) ÷ 10

Daily exposure = 85 + 10 × log10(points ÷ 100)

The saw: 100 × (10 min ÷ 8 h) × 102.4 = 523 points. The day: 85 + 10 × log10(694 ÷ 100) = 93.4 dB(A). Quiet breaks add nothing and take nothing away.

From [HSE, L108 Controlling noise at work](https://www.hse.gov.uk/pubns/priced/l108.pdf) and [The Control of Noise at Work Regulations 2005](https://www.legislation.gov.uk/uksi/2005/1643/contents).

## [Where each level comes from](https://complyonsite.com/guides/calculate-noise-exposure#noise-levels)

**Use a noise survey or dosimeter reading of the work where you have one.** A maker’s declared figure comes from a standard test, not your job, and can be far below it.

Both petrol cut-off saws HSE measured cutting slabs were declared at 98 dB(A). At the operator’s ear they gave 108.6 and 109.8. Entered at 98, the same day reads 88 dB(A), not 93.

From [HSE RR1182, noise of hand-held power tools in use (2022)](https://www.hse.gov.uk/research/rrhtm/rr1182.htm).

Makers’ declared figure, 98 dB(A) 88 dB(A) day

Saw cutting 42 points, 20% of the day

Measured at the ear by HSE, about 109 dB(A) 93 dB(A) day

Saw cutting 523 points, 75% of the day

## [80, 85 and 87, and what each asks](https://complyonsite.com/guides/calculate-noise-exposure#action-values)

**The two action values are read off the noise around the person. The limit is read at the ear, through any hearing protection.** The lesson day is 93 dB(A), past the upper action value. With no hearing protection worn, it is over the 87 limit too.

1. **87 dB(A)** peak 140 dB(C)
   Exposure limit valueChecked at the ear, counting hearing protection
   - No one may be exposed above it.
   - If it happens, cut the exposure at once, find out why and change the controls.
2. **85 dB(A)** peak 137 dB(C)
   Upper exposure action valueChecked on the noise around the person
   - Cut exposure as low as reasonably practicable with a planned set of noise controls. Hearing protection does not count here.
   - Provide hearing protection where that still leaves 85 or more.
   - Mark hearing protection zones, where it must be worn.
   The lesson day, 93 dB(A) around the groundworker
3. **80 dB(A)** peak 135 dB(C)
   Lower exposure action valueChecked on the noise around the person
   - Assess the noise risk.
   - Make hearing protection available to anyone who asks.
   - Give information, instruction and training.
4. **Any level**
   Always
   - Remove the risk at source or, where that is not reasonably practicable, reduce it as low as reasonably practicable.
   - Hearing checks where the risk assessment shows a risk to hearing. HSE’s guidance says that covers anyone regularly above 85, and anyone at particular risk between 80 and 85.

From [The Control of Noise at Work Regulations 2005](https://www.legislation.gov.uk/uksi/2005/1643/contents) and [HSE, L108 Controlling noise at work](https://www.hse.gov.uk/pubns/priced/l108.pdf).

### At the ear, for the 87 limit only

Hearing protection lowers the noise at the ear. It never lowers the action values: a day of 93 around the person still asks everything at 85.

To check the limit, take the protector’s SNR off the task’s noise in dB(C), then add 4 dB back. That is HSE’s allowance for how protectors fit in real use. [The calculator](https://complyonsite.com/tools/noise-exposure-calculator) does it for each task.

Aim for 70 to 80 dB(A) at the ear during each task. Below 70 is over-protection, which HSE says to avoid.

From [The Control of Noise at Work Regulations 2005](https://www.legislation.gov.uk/uksi/2005/1643/contents), [HSE, L108 Controlling noise at work](https://www.hse.gov.uk/pubns/priced/l108.pdf) and [HSE, Hearing protection](https://www.hse.gov.uk/noise/hearingprotection.htm).

### Bangs are checked on their own

Hammering, impact tools and cartridge tools make short peaks. Peak sound pressure is measured in dB(C) and reaches an action value by itself, whatever the day’s dB(A): 135, 137 and the 140 limit.

From [HSE, Noise at work (INDG362)](https://www.hse.gov.uk/pubns/indg362.pdf) and [The Control of Noise at Work Regulations 2005](https://www.legislation.gov.uk/uksi/2005/1643/contents).

## [Fix the biggest share first](https://complyonsite.com/guides/calculate-noise-exposure#fix-the-day)

**On this day, cutting the loudest task saves far more than shortening the longest.** Change the time or the level of any task and watch the day.

**93** dB(A)

85 dB(A) or more

- Dig the bed beside the excavator
  38 points, 5% of the day
  3 h
  85 dB(A)
- Cut kerbs with a petrol cut-off sawBiggest share
  523 points, 75% of the day
  10 min
  109 dB(A)
- Compact the base with a plate compactor
  125 points, 18% of the day
  1 h
  95 dB(A)
- Lay and bed the kerbs
  8 points, 1% of the day
  2 h
  80 dB(A)

Each level step is 3 dB, half the noise. How much quieter a real method is needs its own measurement.

[Open the lesson day in the calculator](https://complyonsite.com/tools/noise-exposure-calculator#c=v1%7Ea85_3h___Dig+the+bed+beside+the+excavator%7Ea109_10___Cut+kerbs+with+a+petrol+cut-off+saw%7Ea95_1h___Compact+the+base+with+a+plate+compactor%7Ea80_2h___Lay+and+bed+the+kerbs)

Opens in a new tab with these tasks, so a day you are working on there stays as it is.

### Ways HSE names

- A quieter tool or process, such as block splitters instead of cut-off saws.
- Less time in the noise. Halving the time in one noise halves its points.
- Distance, screens and barriers, and keeping tools maintained.

From [HSE, Noise in construction](https://www.hse.gov.uk/construction/healthrisks/physical-ill-health-risks/noise.htm) and [HSE, Noise at work (INDG362)](https://www.hse.gov.uk/pubns/indg362.pdf).

**Which lowers this day more?**

## Sources

- [The Control of Noise at Work Regulations 2005](https://www.legislation.gov.uk/uksi/2005/1643/contents)
- [HSE, L108 Controlling noise at work](https://www.hse.gov.uk/pubns/priced/l108.pdf)
- [HSE, Noise at work (INDG362)](https://www.hse.gov.uk/pubns/indg362.pdf)
- [HSE, Noise: advice overview](https://www.hse.gov.uk/noise/advice-overview.htm)
- [HSE, Daily exposure ready-reckoner](https://www.hse.gov.uk/noise/assets/docs/dailyexposure.pdf)
- [HSE, Noise in construction](https://www.hse.gov.uk/construction/healthrisks/physical-ill-health-risks/noise.htm)
- [HSE, Hearing protection](https://www.hse.gov.uk/noise/hearingprotection.htm)
- [HSE RR1182, noise of hand-held power tools in use (2022)](https://www.hse.gov.uk/research/rrhtm/rr1182.htm)

The lesson day’s levels are round figures for teaching. HSE’s research report measured the cut-off saws; the HSE sources listed here give no level for a plate compactor or an excavator. Checked against the regulations and HSE’s pages on 16 November 2026.