# RAMS Builder

> Free RAMS builder for UK construction work. Answer a few questions about the job, or download a blank RAMS template or a filled-in example as a PDF.
> Web page: https://complyonsite.com/tools/rams-builder

## RAMS review

[Check a RAMS](https://complyonsite.com/tools/rams-review)

![A RAMS page with passages highlighted and numbered review comments beside them](https://complyonsite.com/art/rams-review-highlight.webp)

## RAMS template

A blank RAMS for any job: type of work, job details, method statement, risk assessment and briefing record.

Risk assessment and method statement

RAMS

Type of workleft blank to fill in

- **Company**: left blank to fill in
- **Site and work area**: left blank to fill in
- **Planned dates**: left blank to fill in
- **In charge on site**: left blank to fill in
- **Team**: left blank to fill in

Method statement

1. 1
2. 2
3. 3
4. 4
5. 5
6. 6

Risk assessment

| Hazard | Who might be harmed and how | Controls in place | Further action |
| --- | --- | --- | --- |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |
|  |  |  |  |

[Download the templatePDF, 4 pages](https://complyonsite.com/rams/samples/rams-template.pdf)

## RAMS example

A RAMS filled in for one electrical job.

Risk assessment and method statement

Electrical, Unit 3, Canal Side Business Park, Stockport: workshop

- **Company**: Hollins & Reed Electrical Ltd
- **Site and work area**: Unit 3, Canal Side Business Park, Stockport: workshop
- **Planned dates**: 12 October 2026 (one day)
- **In charge on site**: Dan Hollins
- **Team**: Two electricians: Dan Hollins leads and holds the isolation lock; Priya Shah works with him.

Method statement

1. 1 Set up the work areaConfirm the work area and scope before starting. Keep other people outside the active work area. Keep entrances and escape routes clear.
2. 2 Keep people clear of the workAgree how people get past or around the work while it is going on. Put barriers or signs where a route crosses the work. Do not leave open work unattended.
3. 3 Check permits before workAsk whoever runs the site or building whether this job needs a permit to work, permit to isolate or another site permit. Do not start until the required permit is issued and its limits are understood.
4. 4 Confirm the change before opening itName the circuit and item being changed. Check the design or product instructions before touching retained wiring.
5. 5 Isolate and prove deadFind every supply that feeds the work, switch it off and lock it off before you open or touch anything. Prove your tester on a known live supply, test every conductor at the work point, then prove the tester again.
6. 6 Keep it locked off while it is openKeep the supply locked off while the item is open, so nobody can put it back on. Test at the work point again before you touch it.
7. 7 Identify the retained conductorsMark each conductor before removal. Stop if the cable, joint or protective path is not what the information says.
8. 8 Fit the specified replacementRemove the old item without damaging retained wiring. Fit the compatible item and remake each termination to its instructions.
9. 9 Inspect the change before it goes liveInspect the completed work and arrange the testing it needs before it goes back on. Record anything left disconnected or out of service.
10. 10 Control live testingDo dead checks first; test live only when it is necessary and a competent person has planned it. Use suitable leads, probes, barriers and a controlled area, then re-isolate before changing connections.
11. 11 Finish the tests and functional checksComplete the required tests and functional checks. Check covers, guards, labels, fire stopping and connections. Give actual results, defects and restrictions to the customer or site contact. Do not certify unchecked work.
12. 12 Clear and hand back the areaRemove tools, waste and unused materials. Check the area is clean and ready to use. Tell the customer or whoever runs the site when the work is complete.

Risk assessment

- People entering the work area or tripping over materials
  Workers, occupants and visitors
  Mark or barrier the active work area. Store tools and materials away from access routes.
- People using the building or passing by walking into the work or over what it leaves
  Occupants, visitors, members of the public and workers
  Keep the barriers and signs up while the work is active. Give people a clear way round where their normal route is blocked.
- Work starts without the site controls for isolation, access or a dangerous area
  The electrician and other workers on site
  Keep the permit with the work record and follow its boundaries. Stop when the permit is missing, expired or does not cover the actual work.
- The wrong circuit, item or compatibility assumption causes shock, fire or loss of protection
  Electricians and building users
  Stay inside the agreed scope. Stop for an unexpected arrangement or missing information.
- A live conductor or backfeed causes electric shock, burns or an unexpected start
  The electrician and anyone near the work
  Lock off the supply and put your own tag on it. Stop if you cannot find every supply or cannot get a dead reading.
- A live conductor causes electric shock or burns during removal
  The electrician
  Use the safe isolation steps for this installation. Leave your lock and warning tag on while the work goes on.
- A wrong reconnection or damaged protective path causes overheating or electric shock
  The electrician and users
  Keep conductor identity with the circuit. Do not interrupt an earth or bonding path without the agreed method.
- A loose, wrong or damaged termination overheats or leaves the installation unsafe
  The electrician and building users
  Use the specified component and termination method. Keep covers, cable restraint and protective connections complete.
- Unverified work or an incomplete circuit is returned to use
  The electrician and everyone using the installation
  Do not energise work that has failed verification. Tell the customer or site contact about defects and restrictions.
- Exposed live parts or unexpected operation causes shock, burns, falls or fire
  The electrician and people near the test
  Keep people outside the test boundary and use the right test equipment. Stop if the live test cannot be controlled safely.
- Incomplete or unverified work is returned to use and leaves people or property unprotected
  The electrician, the customer or site contact and people using the building
  Record what was tested, what remains out of service and who accepted the hand-back. Do not energise or certify a failed or incomplete installation.
- Debris, tools or unfinished work left in the area
  Workers, occupants and visitors
  Remove waste by the agreed route. Record and protect any unfinished work.

[Download the examplePDF, 4 pages](https://complyonsite.com/rams/samples/electrical-rams-example.pdf)

## RAMS for your trade or task

Each has its own questions, suggested steps and hazards, template and example.

### Access, height and survey

- #### [Working at height RAMS](https://complyonsite.com/tools/rams-builder?job=working-at-height)
- #### [Cherry picker RAMS](https://complyonsite.com/tools/rams-builder?job=cherry-picker)
- #### [Scissor lift RAMS](https://complyonsite.com/tools/rams-builder?job=scissor-lift)
- #### [Boom lift RAMS](https://complyonsite.com/tools/rams-builder?job=boom-lift)
- #### [MEWP RAMS](https://complyonsite.com/tools/rams-builder?job=mewp)
- #### [Mobile scaffold tower RAMS](https://complyonsite.com/tools/rams-builder?job=mobile-scaffold-tower)
- #### [Ladder RAMS](https://complyonsite.com/tools/rams-builder?job=ladder)
- #### [Scaffolding RAMS](https://complyonsite.com/tools/rams-builder?job=scaffolding)
- #### [Drone surveys RAMS](https://complyonsite.com/tools/rams-builder?job=drone-surveys)

### Groundworks and drainage

- #### [Groundworks RAMS](https://complyonsite.com/tools/rams-builder?job=groundworks)
- #### [Excavation RAMS](https://complyonsite.com/tools/rams-builder?job=excavation)
- #### [Trench RAMS](https://complyonsite.com/tools/rams-builder?job=trench)
- #### [Drainage RAMS](https://complyonsite.com/tools/rams-builder?job=drainage)
- #### [Dewatering RAMS](https://complyonsite.com/tools/rams-builder?job=dewatering)
- #### [Electrofusion welding RAMS](https://complyonsite.com/tools/rams-builder?job=electrofusion-welding)

### Concrete, masonry and structure

- #### [Concrete RAMS](https://complyonsite.com/tools/rams-builder?job=concrete)
- #### [Formwork RAMS](https://complyonsite.com/tools/rams-builder?job=formwork)
- #### [Steel fixing RAMS](https://complyonsite.com/tools/rams-builder?job=steel-fixing)
- #### [Concrete floor grinding RAMS](https://complyonsite.com/tools/rams-builder?job=concrete-floor-grinding)
- #### [Bricklaying RAMS](https://complyonsite.com/tools/rams-builder?job=bricklaying)
- #### [Plastering RAMS](https://complyonsite.com/tools/rams-builder?job=plastering)
- #### [Lintels RAMS](https://complyonsite.com/tools/rams-builder?job=lintels)
- #### [Stonework RAMS](https://complyonsite.com/tools/rams-builder?job=stonework)
- #### [Chimneys RAMS](https://complyonsite.com/tools/rams-builder?job=chimneys)
- #### [Staircase installation RAMS](https://complyonsite.com/tools/rams-builder?job=staircase-installation)

### Roofing

- #### [Roofing RAMS](https://complyonsite.com/tools/rams-builder?job=roofing)
- #### [Strip and reroof RAMS](https://complyonsite.com/tools/rams-builder?job=strip-and-reroof)
- #### [Mastic asphalt roofing RAMS](https://complyonsite.com/tools/rams-builder?job=mastic-asphalt-roofing)
- #### [Liquid roofing RAMS](https://complyonsite.com/tools/rams-builder?job=liquid-roofing)
- #### [Leadwork RAMS](https://complyonsite.com/tools/rams-builder?job=leadwork)
- #### [Living roofs RAMS](https://complyonsite.com/tools/rams-builder?job=living-roofs)
- #### [Rooflights RAMS](https://complyonsite.com/tools/rams-builder?job=rooflights)
- #### [Roof sheeting RAMS](https://complyonsite.com/tools/rams-builder?job=roof-sheeting)

### Cladding, glazing and weatherproofing

- #### [Cladding RAMS](https://complyonsite.com/tools/rams-builder?job=cladding)
- #### [Glazing RAMS](https://complyonsite.com/tools/rams-builder?job=glazing)
- #### [Damp proofing RAMS](https://complyonsite.com/tools/rams-builder?job=damp-proofing)
- #### [Loft insulation RAMS](https://complyonsite.com/tools/rams-builder?job=loft-insulation)
- #### [Flood work RAMS](https://complyonsite.com/tools/rams-builder?job=flood-work)

### Carpentry, joinery and fit-out

- #### [Joinery RAMS](https://complyonsite.com/tools/rams-builder?job=joinery)
- #### [Carpentry RAMS](https://complyonsite.com/tools/rams-builder?job=carpentry)
- #### [Drylining RAMS](https://complyonsite.com/tools/rams-builder?job=drylining)
- #### [Suspended ceiling RAMS](https://complyonsite.com/tools/rams-builder?job=suspended-ceiling)
- #### [Drilling RAMS](https://complyonsite.com/tools/rams-builder?job=drilling)
- #### [Core drilling RAMS](https://complyonsite.com/tools/rams-builder?job=core-drilling)
- #### [Acoustic panel installation RAMS](https://complyonsite.com/tools/rams-builder?job=acoustic-panel-installation)
- #### [Timber treatment RAMS](https://complyonsite.com/tools/rams-builder?job=timber-treatment)

### Floors, walls and finishes

- #### [Flooring RAMS](https://complyonsite.com/tools/rams-builder?job=flooring)
- #### [Tiling RAMS](https://complyonsite.com/tools/rams-builder?job=tiling)
- #### [Floor removal RAMS](https://complyonsite.com/tools/rams-builder?job=floor-removal)
- #### [Raised floors RAMS](https://complyonsite.com/tools/rams-builder?job=raised-floors)
- #### [Resin flooring RAMS](https://complyonsite.com/tools/rams-builder?job=resin-flooring)
- #### [Wet rooms RAMS](https://complyonsite.com/tools/rams-builder?job=wet-rooms)
- #### [Painting and decorating RAMS](https://complyonsite.com/tools/rams-builder?job=painting-and-decorating)
- #### [Specialist coatings RAMS](https://complyonsite.com/tools/rams-builder?job=specialist-coatings)

### Electrical, alarms and controls

- #### [Electrical RAMS](https://complyonsite.com/tools/rams-builder?job=electrical)
- #### [CCTV installation RAMS](https://complyonsite.com/tools/rams-builder?job=cctv-installation)
- #### [Fire alarm RAMS](https://complyonsite.com/tools/rams-builder?job=fire-alarm)

### Plumbing, heating and ventilation

- #### [Plumbing RAMS](https://complyonsite.com/tools/rams-builder?job=plumbing)
- #### [Ventilation RAMS](https://complyonsite.com/tools/rams-builder?job=ventilation)
- #### [Kitchen extraction RAMS](https://complyonsite.com/tools/rams-builder?job=kitchen-extraction)
- #### [Pipe insulation RAMS](https://complyonsite.com/tools/rams-builder?job=pipe-insulation)
- #### [Power flushing RAMS](https://complyonsite.com/tools/rams-builder?job=power-flushing)
- #### [Closed system flushing RAMS](https://complyonsite.com/tools/rams-builder?job=closed-system-flushing)
- #### [Catering equipment RAMS](https://complyonsite.com/tools/rams-builder?job=catering-equipment)
- #### [Ductwork access panel installation RAMS](https://complyonsite.com/tools/rams-builder?job=ductwork-access-panel-installation)

### Hot work and metalwork

- #### [Hot works RAMS](https://complyonsite.com/tools/rams-builder?job=hot-works)
- #### [Welding RAMS](https://complyonsite.com/tools/rams-builder?job=welding)
- #### [Cutting RAMS](https://complyonsite.com/tools/rams-builder?job=cutting)
- #### [Grinding RAMS](https://complyonsite.com/tools/rams-builder?job=grinding)

### Breaking out, strip-out and demolition

- #### [Demolition RAMS](https://complyonsite.com/tools/rams-builder?job=demolition)
- #### [Concrete breakout RAMS](https://complyonsite.com/tools/rams-builder?job=concrete-breakout)
- #### [Controlled breakout RAMS](https://complyonsite.com/tools/rams-builder?job=controlled-breakout)
- #### [Concrete floor cutting RAMS](https://complyonsite.com/tools/rams-builder?job=concrete-floor-cutting)
- #### [Removing plaster RAMS](https://complyonsite.com/tools/rams-builder?job=removing-plaster)

### Site set-up, lifting and logistics

- #### [Strip out RAMS](https://complyonsite.com/tools/rams-builder?job=strip-out)
- #### [Temporary works RAMS](https://complyonsite.com/tools/rams-builder?job=temporary-works)
- #### [Temporary site services RAMS](https://complyonsite.com/tools/rams-builder?job=temporary-site-services)
- #### [Manual handling RAMS](https://complyonsite.com/tools/rams-builder?job=manual-handling)
- #### [Loading and unloading RAMS](https://complyonsite.com/tools/rams-builder?job=loading-and-unloading)
- #### [Lifting RAMS](https://complyonsite.com/tools/rams-builder?job=lifting)
- #### [Crane lifting RAMS](https://complyonsite.com/tools/rams-builder?job=crane-lifting)
- #### [Lorry loader RAMS](https://complyonsite.com/tools/rams-builder?job=hiab)

### External works and landscaping

- #### [Landscaping RAMS](https://complyonsite.com/tools/rams-builder?job=landscaping)
- #### [Stump grinding RAMS](https://complyonsite.com/tools/rams-builder?job=stump-grinding)
- #### [Tarmac laying RAMS](https://complyonsite.com/tools/rams-builder?job=tarmac-laying)
- #### [Line marking RAMS](https://complyonsite.com/tools/rams-builder?job=line-marking)
- #### [Street furniture RAMS](https://complyonsite.com/tools/rams-builder?job=street-furniture)
- #### [Security fencing RAMS](https://complyonsite.com/tools/rams-builder?job=security-fencing)

### Cleaning and building care

- #### [Cleaning RAMS](https://complyonsite.com/tools/rams-builder?job=cleaning)
- #### [Abrasive cleaning RAMS](https://complyonsite.com/tools/rams-builder?job=abrasive-cleaning)
- #### [Building conservation cleaning RAMS](https://complyonsite.com/tools/rams-builder?job=building-conservation-cleaning)
- #### [Window cleaning RAMS](https://complyonsite.com/tools/rams-builder?job=window-cleaning)

### Pest and bird control

- #### [Pest work RAMS](https://complyonsite.com/tools/rams-builder?job=pest-work)
- #### [Bird proofing RAMS](https://complyonsite.com/tools/rams-builder?job=bird-proofing)
- #### [Rodent proofing RAMS](https://complyonsite.com/tools/rams-builder?job=rodent-proofing)

### Higher-risk work

- #### [Asbestos removal RAMS](https://complyonsite.com/tools/rams-builder?job=asbestos-removal)
- #### [Confined space RAMS](https://complyonsite.com/tools/rams-builder?job=confined-space)

## What one answer adds to your RAMS

Every job is asked this, whatever the trade. Each answer adds its own step and hazards.

What will you stand on to reach the work?

### Nothing is added

Nothing above floor level is assumed to be reachable from the floor.

### Use the ladder or steps

Hazard

Who might be harmed and how

The person working from it, if the feet slip or they overreach to one side.

Controls in place

- Secure the equipment where it could move.

Who might be harmed and how

Anyone passing or working under the ladder while it is in use.

Controls in place

- Keep the base and area below clear.

[HSE: When and how to use a ladder at work](https://www.hse.gov.uk/work-at-height/ladders/when-how-to-use-ladders-safely.htm)

### Set up access equipment

Hazard

Who might be harmed and how

The person on the platform, if it is set up on an unsuitable surface and shifts under them.

Controls in place

- Place access equipment on a firm, level surface.

Who might be harmed and how

Anyone passing or working underneath.

Controls in place

- Keep tools and materials secure while working above ground.

[HSE: Work at height](https://www.hse.gov.uk/work-at-height/index.htm)

### Use the mobile tower

Hazard

Who might be harmed and how

The person on the platform, where a guardrail or toe board is missing or was never fitted.

Controls in place

- Fit the required guardrails, braces and stabilisers.

Who might be harmed and how

Anyone on or beside the tower, if it is moved with people or materials on it, or built without its stabilisers.

Controls in place

- Move the tower only with nobody and nothing on it.

Who might be harmed and how

Anyone passing or working underneath.

Controls in place

- Keep the area around the tower controlled.

[HSE: Work at height](https://www.hse.gov.uk/work-at-height/index.htm)

### Use the MEWP

Hazard

Who might be harmed and how

The operator, and anyone beside the machine, where the ground gives way or it is worked outside its limits.

Controls in place

- Use a trained operator and follow the machine limits.
- Stop when the wind reaches the machine’s limit.
- Keep the agreed rescue arrangement available.

Who might be harmed and how

The operator, and anyone touching the machine, from shock or burns.

Controls in place

- Check for overhead lines before raising the platform and keep the agreed clearance.

Who might be harmed and how

Anyone passing or working underneath.

Controls in place

- Barrier the area below so the public and other workers cannot walk under the platform.

[HSE: Work at height](https://www.hse.gov.uk/work-at-height/index.htm)

### Work from the scaffold

Hazard

Who might be harmed and how

Anyone working on the lift, where a guardrail, board or tie has been taken out to get the work done.

Controls in place

- Never remove boards, ties, guardrails or bracing; ask the scaffolding contractor to alter it.
- Report damage or a missing tag and keep off until it is checked.

Who might be harmed and how

Anyone passing or working underneath, including the public where the scaffold is over a footpath.

Controls in place

- Fit brick guards or netting where materials could fall on people below.

[HSE: Scaffolding](https://www.hse.gov.uk/construction/safetytopics/scaffoldinginfo.htm)

### Start with your trade

- [Groundworks RAMS](https://complyonsite.com/tools/rams-builder?job=groundworks)
- [Roofing RAMS](https://complyonsite.com/tools/rams-builder?job=roofing)
- [Electrical RAMS](https://complyonsite.com/tools/rams-builder?job=electrical)
- [Plumbing RAMS](https://complyonsite.com/tools/rams-builder?job=plumbing)
- [Joinery RAMS](https://complyonsite.com/tools/rams-builder?job=joinery)
- [Scaffolding RAMS](https://complyonsite.com/tools/rams-builder?job=scaffolding)
- [All trades and tasks](https://complyonsite.com/tools/rams-builder)

## How the RAMS builder works

### Choosing the work

Search for the job or pick your trade, then answer questions about how it will be done.

### Writing the document

Keep the suggestions that apply and edit them. Missing site facts, products, equipment, competence and approvals are listed as still needed.

### Downloading the PDF

The method statement and risk assessment come out as one A4 PDF.

## What the law asks for

### What a RAMS is

A risk assessment and method statement. The risk assessment records what could cause harm on the job, who could be harmed and how, and the controls that keep the risk down. The method statement sets out how the work will be done, step by step, in the order it happens.

A client or main contractor will usually ask for one before you start. RAMS is a site term, not a legal one: the law asks for the risk assessment and for the work to be planned, and a method statement is the usual way to show that plan for one job.

### What the law asks for

- Employers, and self-employed people doing construction work, must make a suitable and sufficient assessment of the risks to their own people and to anyone else affected by the work ([Management of Health and Safety at Work Regulations 1999, regulation 3](https://www.legislation.gov.uk/uksi/1999/3242/regulation/3)).
- An employer with five or more employees must record the significant findings and any group of employees it finds especially at risk. The assessment must be reviewed if there is reason to think it is no longer valid, or the work has changed significantly.
- Every contractor must plan, manage and monitor its work so that, so far as is reasonably practicable, it is done without risks to health and safety, and must give its workers the information and instructions they need, including the hazards the risk assessment found ([Construction (Design and Management) Regulations 2015, regulation 15](https://www.legislation.gov.uk/uksi/2015/51/regulation/15)).

HSE guidance: [the steps to manage risk](https://www.hse.gov.uk/simple-health-safety/risk/steps-needed-to-manage-risk.htm) and [what contractors must do under CDM](https://www.hse.gov.uk/construction/cdm/2015/contractors.htm). This is the law in Great Britain; Northern Ireland has its own equivalent regulations.

### What the builder does

You choose the work and answer questions about how the job will be done, such as what you will stand on and what else is going on nearby. Your answers decide which steps, hazards and controls it suggests.

Many suggestions link to the HSE guidance they draw on. Your work is kept in this browser and, signed in, on your account with its photos; the PDF is made on your device. A briefing you send to phones goes through your account.

### Separate documents

A COSHH assessment, lifting plan, permit to work, asbestos survey and the principal contractor’s construction phase plan are separate from the RAMS.

### Reviewing a RAMS before work starts

[RAMS review](https://complyonsite.com/tools/rams-review) reads a RAMS PDF, yours before you send it or one a subcontractor sends you, and lists the points to raise, each marked on the page it comes from. Quick reviews are free.
