# Tower scaffold inspection checklist

> Inspect a mobile tower scaffold on your phone after building it and issue the report as a PDF. Or print the blank tower checklist.
> Web page: https://complyonsite.com/tools/scaffold-inspection-checklist?kind=tower

Inspect a mobile tower on your phone after building it, and issue the report as a PDF.

- Free, no account
- Works on one bar of signal
- Blank PDF to print

[Doing it on paper? **Print the blank checklist (PDF)**](https://complyonsite.com/samples/mobile-tower-inspection-checklist-blank.pdf)

[![The top of a filled mobile tower inspection report for a school hall. The inspector’s conclusion in large type, safe to use, then a castor brake put right before first use.](https://complyonsite.com/example-covers/scaffold/tower-inspection-example.webp)](https://complyonsite.com/samples/mobile-tower-inspection-report-example.pdf)

A worked example. [Open the PDF](https://complyonsite.com/samples/mobile-tower-inspection-report-example.pdf)

## What goes on a tower inspection report

One page the site can read at a glance, with your conclusion largest.

1. **Which tower and why** The site, where the tower stands, its make and model, platform height, and why it was inspected. After building it, after moving it, weekly or after bad weather.
2. **Your conclusion** Safe to use, safe to use with restrictions, or not to be used, in your words and printed largest with your name.
3. **Defects and action** Where, what you found, the action taken and the further action needed.
4. **The checks** Castors and base plates, legs, stabilisers, frames, braces, platforms and trapdoors, guardrails, access, the maker’s instructions, surroundings and tag.
5. **Who and for whom** Your name, position and PASMA or CISRS card, the firm it was for, and your signature.

[See the worked example](https://complyonsite.com/samples/mobile-tower-inspection-report-example.pdf) or [print the blank checklist](https://complyonsite.com/samples/mobile-tower-inspection-checklist-blank.pdf).

## The tower checklist

Each check takes OK, Defect or N/A. You can add your own.

1. **Castors, brakes or base plates** Every upright on a castor locked in or a supported base plate. Wheels, housings and stems undamaged, turn and swivel, brakes hold and are on in use. Moved only with nobody and nothing on it
2. **Adjustable legs and level** Within the maker's extension limit, threads undamaged, locking clips in, tower level, no bricks or blocks under it
3. **Stabilisers or outriggers** Fitted as the maker says for this height, feet on firm ground, tied in if the maker says so
4. **Frames, locks and clips** Frames plumb, not cracked, bent, dented or corroded, clips and locks engaged at every joint
5. **Braces** In the maker's pattern, every hook closed
6. **Platforms and trapdoors** Fully decked and level, decking not split or warped, wind locks on, trapdoors open and close, load within the safe working load, no ladders, steps or boxes on it
7. **Guardrails and toe boards** Top rail, mid rail and toe boards secure on every open side of the platform
8. **Ladders and internal access** Climbed inside, never on the outside frames, rungs sound, clear and not slippery, any separate ladder secured as the maker says
9. **Built to the maker’s instructions** Height and parts as the maker's instructions, nothing mixed
10. **Ground, wind and surroundings** Firm, level ground with no holes, pits or loose covers, wind within limits, no sheeting or banners, clear of power lines, vehicles and people
11. **Tag or label** Tag shows today's status, a tower not to be used is marked so

## Giving the report to the firm

They get the exact report you issued, and never need an account.

- **Share the PDF** WhatsApp, text or anything else on your phone. They get the file itself.
- **Send a link or show a QR code** They download the exact report with no account, and can sign to say they have seen it. Their signed copy comes back to your phone.
- **Print it** For the site file or the scaffold.

## When a tower must be inspected

The Work at Height Regulations 2005 ([regulation 12](https://www.legislation.gov.uk/uksi/2005/735/regulation/12)) ask for an inspection by a competent person in these cases.

- After it is built, and each time it is taken down and put up again, before it is used (paragraph 2).
- At suitable intervals where conditions could make it worse, and after anything that could affect its safety, such as bad weather (paragraph 3).
- Where someone could fall 2 metres or more from it during construction work, an inspection on the site within the last 7 days (paragraph 4).

For any inspection of a scaffold or tower used for construction work that someone could fall 2 metres or more from, the inspector writes a report before the end of the working period and gives a copy within 24 hours to whoever the inspection was for (paragraph 7). That firm keeps it at the site until the construction work there is finished, then at its office for 3 months (paragraph 8). For any other inspection under the regulation, the result is recorded and kept until the next one is recorded (paragraph 6). [Schedule 7](https://www.legislation.gov.uk/uksi/2005/735/schedule/7) lists what the report says, and this report prints each of those details. In Northern Ireland they are in [Schedule 8 of the Northern Ireland regulations](https://www.legislation.gov.uk/nisr/2005/279/schedule/8).

## Questions

### Do I need an account?

No. Inspect it, sign and share the PDF. The report stays on your phone.

### When does a mobile tower need inspecting?

After it is built, before it is used, and after anything that could affect it, such as bad weather or taking it down and putting it up somewhere else. Where someone could fall 2 metres or more during construction work, it also needs an inspection on the site within the last 7 days.

### What if there is no signal?

Open the page while you have signal and it gets ready. Then it fills in, signs and makes the PDF without signal.

### Does the tag count as the report?

No. The tag shows its status to people at the tower. Where someone could fall 2 metres or more during construction work, the written report with the details in Schedule 7 is also needed, and this page makes that report.

### Can I issue it with gaps?

Yes. Nothing is required. A check you did not mark prints Not marked.