# Daily sign-in sheet example

> Eight people and two visitors signed in and out for one day. A filled site register to read here or download as PDF, Word or Excel.
> Web page: https://complyonsite.com/tools/site-register-examples?job=daily-sign-in-sheet

[All 2 examples](https://complyonsite.com/tools/site-register-examples?job=daily-sign-in-sheet#ex-choose)

## Daily sign-in sheet

Eight people and two visitors signed in and out for one day.

[Download PDF](https://complyonsite.com/register/examples/daily-sign-in-sheet.pdf) [Download Word](https://complyonsite.com/register/examples/daily-sign-in-sheet.docx)

[Download Excel](https://complyonsite.com/register/examples/daily-sign-in-sheet.xlsx) [Sign in by phone](https://complyonsite.com/tools/site-register)

### Sources

- [CDM 2015, regulation 13(4)](https://www.legislation.gov.uk/uksi/2015/51/regulation/13)
- [HSE, Fire safety in construction (HSG168), paragraph 308](https://www.hse.gov.uk/pubns/books/hsg168.htm)

Worked example of a made-up job. Not a record of real work.

### Daily Sign-in Sheet

#### Hollins & Reed Contracting Ltd

1. **Date** Monday 7 September 2026
2. **Contract name** House extension, House 2
3. **Site address** House 2, Thornley Vale Estate, Stockport

#### Name

1. **Dan Hollins** Company: Hollins & Reed Contracting Ltd. Time in: 07:30. Signature: signed. Lunch: 12:30 to 13:00. Time out: 17:00. Signature out: signed
2. **Reece Ollerton** Company: Hollins & Reed Contracting Ltd. Time in: 08:00. Signature: signed. Lunch: 12:30 to 13:00. Time out: 16:30. Signature out: signed
3. **Joe Penketh** Company: Hollins & Reed Groundworks Ltd. Time in: 08:00. Signature: signed. Lunch: 12:30 to 13:00. Time out: 16:30. Signature out: signed
4. **Aaron Mellor** Company: Hollins & Reed Groundworks Ltd. Time in: 08:00. Signature: signed. Lunch: 12:30 to 13:00. Time out: 16:30. Signature out: signed
5. **Tom Birtles** Company: Hollins & Reed Groundworks Ltd. Time in: 08:00. Signature: signed. Lunch: 12:30 to 13:00. Time out: 16:30. Signature out: signed
6. **Ste Kenyon** Company: Hollins & Reed Groundworks Ltd. Time in: 08:00. Signature: signed. Lunch: 12:30 to 13:00. Time out: 16:30. Signature out: signed
7. **Helen Ashworth** Company: Council building control. Time in: 08:40. Signature: signed. Time out: 09:05. Signature out: signed. Visiting: Dan Hollins. Badge no.: V1
8. **Gary Sidebotham** Company: Hollins & Reed Concrete Pumping Ltd. Time in: 09:00. Signature: signed. Time out: 12:30. Signature out: signed
9. **Paul Heywood** Company: Hollins & Reed Concrete Ltd. Time in: 10:32. Signature: signed. Time out: 11:50. Signature out: signed
10. **Neil Greenhalgh** Company: Thornley Vale Estates Ltd. Time in: 14:50. Signature: signed. Time out: 15:15. Signature out: signed. Visiting: Dan Hollins. Badge no.: V2

## Choose a sheet

- [**Daily sign-in sheet** Eight people and two visitors signed in and out for one day.](https://complyonsite.com/tools/site-register-examples?job=daily-sign-in-sheet#example)
- [**Site induction register** Everyone inducted on the job, with visitors and cards shown.](https://complyonsite.com/tools/site-register-examples?job=induction-register#example)

## Construction site register format

No law sets a format. If you use a register for site inductions and a fire roll call, these columns do the job.

- ### Name and company
  Shows who was let in. The principal contractor must take the necessary steps to keep unauthorised people off the site.
  [CDM 2015, regulation 13(4)](https://www.legislation.gov.uk/uksi/2015/51/regulation/13)
- ### Time in and time out
  Gives you the people to count after an evacuation. HSE’s fire guidance gives checking off against site security logs brought to the assembly point as one way to confirm everyone is there.
  [HSE, Fire safety in construction (HSG168), paragraph 308](https://www.hse.gov.uk/pubns/books/hsg168.htm)
- ### Visiting and badge number
  Shows who a visitor came to see and which badge is still out. HSE says a visitor’s induction should fit the visit, and an escorted visitor needs the main hazards and controls.
  [HSE, Managing health and safety in construction (L153), paragraph 134](https://www.hse.gov.uk/pubns/books/l153.htm)
- ### Induction date and signature
  The principal contractor must make sure a suitable site induction is given, and a contractor gives it where the principal contractor has not. The law does not ask for a record of it. A date and a signature show it was done.
  [CDM 2015, regulation 15(9)](https://www.legislation.gov.uk/uksi/2015/51/regulation/15)
- ### Only what you need
  Data protection law says to collect only the personal data you need. These examples write shown once a card has been seen, not its number.
  [ICO, data minimisation](https://ico.org.uk/for-organisations/uk-gdpr-guidance-and-resources/data-protection-principles/a-guide-to-the-data-protection-principles/data-minimisation/)