Electrical RAMS Builder

Electrical risk assessment and method statement

Draft RAMS for safe isolation, dead alterations, consumer unit changes, containment and cabling, fibre termination, device mounting, portable appliance testing, and fixed-installation and emergency-lighting inspection and test. Enter the site, edit the suggested steps and check the PDF draft.

  • Free to use
  • No account needed
  • Questions follow HSE guidance
  • Work recovers in this browser

Prepare the Electrical RAMS

Checking this browser for your work…

Electrical RAMS

What will you be doing?

More details

Pick everything this RAMS covers. The questions that follow are chosen from what you tick here.

What a Electrical RAMS covers

Electrical work on dead circuits and the testing around it: proving dead, altering or replacing dead equipment, changing a domestic consumer unit, running containment and cable, terminating fibre, mounting devices, and inspecting and testing fixed installations, appliances and emergency lighting.

  • Dead alteration/replacement
  • Safe isolation
  • Residential consumer unit
  • Containment/cable
  • Fibre termination
  • Portable test
  • Device mounting
  • Fixed-installation inspection/test
  • Emergency-lighting inspection/test

Suggested steps and hazards for Electrical

What it offers for dead alteration/replacement before you have answered anything.

  1. Isolate and prove dead

    • Find every supply that feeds the work, switch it off and lock it off before you open or touch anything.
    • Prove your tester on a known live supply, test every conductor at the work point, then prove the tester again.

    Hazard

    A live conductor or backfeed causes electric shock, burns or an unexpected start

    Who might be harmed and how

    The electrician and anyone near the work

    Controls in place

    • Lock off the supply and put your own tag on it.
    • Stop if you cannot find every supply or cannot get a dead reading.

    The job has to stay dead the whole time terminals and gear are open.

    Electricity at work: Safe working practices
  2. Check permits before work

    • Ask the site manager whether this job needs a permit to work, permit to isolate or another site permit.
    • Do not start until the required permit is issued and its limits are understood.

    Hazard

    Work starts without the site controls for isolation, access or a dangerous area

    Who might be harmed and how

    The electrician, site manager and other workers

    Controls in place

    • Keep the permit with the work record and follow its boundaries.
    • Stop when the permit is missing, expired or does not cover the actual work.

    A site permit tells the team what has been controlled and where the controls stop.

    Electrical safety on construction sites
  3. Control live testing

    • Do dead checks first; test live only when it is necessary and a competent person has planned it.
    • Use suitable leads, probes, barriers and a controlled area, then re-isolate before changing connections.

    Hazard

    Exposed live parts or unexpected operation causes shock, burns, falls or fire

    Who might be harmed and how

    The electrician and people near the test

    Controls in place

    • Keep people outside the test boundary and use the right test equipment.
    • Stop if the live test cannot be controlled safely.

    Live testing has extra exposure and needs a clear reason, boundary and stopping rule.

    Safety in electrical testing at work

What the builder asks about Electrical

Your answers decide which steps, hazards and controls it suggests.

The job

  • What are you changing?
  • What supply feeds the work?
  • Which consumer unit are you replacing?
  • What are you checking?
  • What is the inspection for?
  • Which emergency-light test are you doing?

Where

  • What will be affected while it is off?
  • What pipes or cables run behind or through the surface where the cable or device is fixed?
  • Is the building older than the year 2000? Older buildings can have asbestos in them.

How it’s done

  • What will you stand on to reach the work?
  • What information have you got for the change?
  • Can you see and check every connection?
  • How will you keep it off?
  • What did the existing-installation check find?

What your Electrical RAMS includes

Method statement

The sequence of the work, step by step. The suggestions are a starting point; you write the method for the job as it will be done.

Risk assessment

Each hazard, who could be harmed, the controls in place and any further action. There is no risk score: you judge each row against the real site, and adding a hazard does not put its controls in place.

PDF draft for review

The document as you left it, for someone competent to check. A download is not approval and not permission to start work.