Pipe and duct insulation RAMS Builder

Pipe and duct insulation risk assessment and method statement

Prepare RAMS for lagging pipework and insulating ductwork. Enter the site and the pipe services, keep the suggested steps that fit and review the PDF draft.

  • Free to use
  • No account needed
  • Questions follow HSE guidance
  • Work recovers in this browser

Prepare the Pipe and duct insulation RAMS

Checking this browser for your work…

Pipe and duct insulation RAMS

What will you be doing?

More details

Pick everything this RAMS covers. The questions that follow are chosen from what you tick here.

What a Pipe and duct insulation RAMS covers

Fitting thermal or fire insulation to pipework and ductwork once the services are installed and identified.

  • Pipework insulation
  • Ductwork insulation

Suggested steps and hazards for Pipe and duct insulation

What it offers for pipework insulation before you have answered anything.

  1. Do not climb into a tight space on your own

    • Risers, crawl spaces, ceiling voids, ducts and plant pits can hold bad air, and you can get stuck.
    • If the only way to lag it is to get inside one, stop: that is a permit job with the air tested first.
    • Somebody stays outside watching, and there is a way of getting you out before anyone goes in.

    Hazard

    Being overcome by bad air, or trapped, inside a riser, void, duct or pit

    Who might be harmed and how

    The insulator and whoever tries to pull them out

    Controls in place

    • Lag it from outside the space wherever you can.
    • No permit, no air test, no rescue plan: nobody goes in.

    Most people who die in confined spaces are the second one in, going after the first.

    HSE: Confined spaces
  2. Confirm the pipe service and temperature

    • Check what the pipe carries and the specified operating temperature before choosing insulation.
    • Stop if the service or temperature is unknown.

    Hazard

    Poor performance, condensation or burns from the wrong insulation

    Who might be harmed and how

    Insulators, service workers and occupants

    Controls in place

    • Use the project specification and product data.
    • Do not guess the insulation from the pipe appearance.

    The service and temperature set the insulation performance needed.

    Pipe Insulation and lagging
  3. Use the specified pipe system

    • Check the product, thickness and facing against the specification before fitting.
    • Keep the product information with the work.

    Hazard

    The pipe loses thermal or fire performance because an unsuitable product is fitted

    Who might be harmed and how

    Insulators, service workers and building occupants

    Controls in place

    • Use the named system and thickness.
    • Stop if the product or thickness is not identified.

    Insulation thickness and product choice depend on the pipe service and temperature.

    Pipe Insulation and lagging

What the builder asks about Pipe and duct insulation

Your answers decide which steps, hazards and controls it suggests.

The job

  • What service is the pipe carrying?
  • What shape is the duct?

How it’s done

  • What will you stand on to reach the work?
  • Which pipe insulation system is specified?
  • What performance must the duct insulation provide?
  • What is already around the pipe?
  • What is already around the duct?
  • How will the duct insulation be held in place?
  • Will you cut anything on site, and with what?
  • How will the insulation materials get to the work?

What your Pipe and duct insulation RAMS includes

Method statement

The sequence of the work, step by step. The suggestions are a starting point; you write the method for the job as it will be done.

Risk assessment

Each hazard, who could be harmed, the controls in place and any further action. There is no risk score: you judge each row against the real site, and adding a hazard does not put its controls in place.

PDF draft for review

The document as you left it, for someone competent to check. A download is not approval and not permission to start work.