Excavation dewatering RAMS Builder

Excavation dewatering risk assessment and method statement

Prepare RAMS for pumping water out of an excavation and for bypassing a watercourse around the works. Add the pump, discharge point and support details, edit the suggested steps and review the PDF draft.

  • Free to use
  • No account needed
  • Questions follow HSE guidance
  • Work recovers in this browser

Prepare the Excavation dewatering RAMS

Checking this browser for your work…

Excavation dewatering RAMS

What will you be doing?

More details

Pick everything this RAMS covers. The questions that follow are chosen from what you tick here.

What a Excavation dewatering RAMS covers

Dewatering here means keeping the works dry with pumps: lifting water out of a hole to an agreed discharge, or diverting a stream or ditch flow past the excavation while you work in it.

  • Pump water from an excavation
  • Bypass a watercourse flow

Suggested steps and hazards for Excavation dewatering

What it offers for pump water from an excavation before you have answered anything.

  1. Check the weather before you start

    • Do not lift or fix pumps, hoses and temporary barriers in strong wind; a large sheet is a sail.
    • Stop in heavy rain, ice or lightning, and rest in the shade in hot weather.

    Hazard

    Wind catches the pumps, hoses and temporary barriers or blows someone off balance at height

    Who might be harmed and how

    The team and people below

    Controls in place

    • Agree a wind limit for panels and platforms and check the forecast each morning.
    • Tie down or take in loose materials before you leave.

    Wind is the main weather cause of falls and dropped loads in outside work at height.

    HSE: Work at height
  2. Check the dewatering method

    • Read the excavation and dewatering assessment before placing a pump.
    • Check the water source, nearby structures and ground support are covered.

    Hazard

    Collapse, settlement or pollution caused by uncontrolled dewatering

    Who might be harmed and how

    The excavation team and people nearby

    Controls in place

    • Stop if the water or stability risk is not understood.
    • Keep the agreed support arrangement unchanged.

    Pumping can change excavation stability and nearby ground, so its effect must be checked first.

    HSE: Excavations
  3. Keep the pump power safe in the wet

    • Run pumps off 110 volt or through an RCD, with leads and plugs checked and in date.
    • Keep joints and boards up out of the water and off the ground.

    Hazard

    A shock from a pump, lead or board standing in water

    Who might be harmed and how

    The pump team and anyone in the excavation

    Controls in place

    • Only an electrician isolates, locks off and proves dead before anyone opens a pump or a board.
    • Never lift a running pump by its cable, and never dry a damaged lead out and carry on.

    Wet ground gives the current a path straight through whoever is stood in it.

    HSE: Electricity, systems in buildings

What the builder asks about Excavation dewatering

Your answers decide which steps, hazards and controls it suggests.

The job

  • What water will the pump remove?
  • What flow will the bypass carry?

Where

  • Where will the water go?
  • Could pumping affect the ground?

How it’s done

  • What will you stand on to reach the work?
  • How will you keep the flow moving?
  • How will the pumps, hoses and barriers get to the work?

What you’ve been told

  • Is the paperwork in for working in the stream?

What your Excavation dewatering RAMS includes

Method statement

The sequence of the work, step by step. The suggestions are a starting point; you write the method for the job as it will be done.

Risk assessment

Each hazard, who could be harmed, the controls in place and any further action. There is no risk score: you judge each row against the real site, and adding a hazard does not put its controls in place.

PDF draft for review

The document as you left it, for someone competent to check. A download is not approval and not permission to start work.