Snag list template
Choose a design
Three snagging list layouts, from the site walk to handover
Each one downloads as PDF, Excel or Word, and every column and box can be changed on the sheet above first.
Site walk list
Every snag, its trade and dates, signed off once checked
Trade snag sheet
One trade’s list, with done and initials on each line
Handover list
The client’s list, with an accept column and both signatures
What to put on a snagging list

A number for every snag
Number each snag once and never reuse it. The trade, the client and your own team can then talk about snag 14 and mean the same thing.
Where it is, exactly
Plot, floor, room and wall: enough for someone who was not on the walk to find it. A photo reference helps when the snag is small.
Who owns it, and by when
The trade or company putting it right, and a date to have it done. A list grouped by trade is quicker to hand out than one long list.
Done, and checked
The date the trade says it is done, then your initials once you have seen it. A snag is closed when it is checked, not when it is ticked.
Walk the job on the day and give each snag the next number as you find it. Initial a line only once you have walked it again and seen it put right, not when the trade ticks it.
Five snagging list examplesSnagging list questions
Can I keep a snag list in Excel?
Yes. The Excel file has the same columns as the sheet above, repeats its heading rows on every printed page and prints on A4. Use Excel’s own filter on the Trade column to give each trade only their snags.
Is there a filled-in snag list sample?
Yes. Five worked examples for real kinds of job, from a kitchen and bathroom refit to an office fit-out handover, each as PDF, Excel and Word, ready to change to fit your own.
What is the difference between a snag list and a defects list?
A snag list is made before handover: the contractor walks the work, lists what is unfinished or wrong, and puts it right before the client takes over. A defects list comes after handover, for faults that show up later, and is dealt with under the defects period your contract sets.
Who signs a handover snag list?
The contractor and the client, or the client’s agent. Sign once every snag has been put right and checked on site, not when the trade ticks it done. The handover layout has a column for the client to accept each snag and a box for each signature.
Is it free?
Yes. There is no account and no email to give. The files are made in your browser.