How to calculate HAVS exposure
Count the time each tool is running in someone’s hands. Then add every tool that person uses.
- Find each tool’s trigger time. That is the time it is running in the hands, not the time spent on the job.
- Turn it into points. Points are 2 × vibration² × hours, with the vibration in m/s².
- Add every tool that person uses that day. Compare the total with 100 points, the exposure action value, and 400 points, the exposure limit value.
One person’s morning, 07:30 to 12:00
One operative breaks out a long strip of concrete yard, lays a duct and reinstates the trench.
- 07:30Mark out15 min
- 07:45Break out the concrete1 h 15 min, breaker running 30 min
- 09:00Dig out and barrow away45 min
- 09:45Tea break15 min
- 10:00Lay the duct15 min
- 10:15Backfill and compact in layers1 h 45 min, compactor running 1 h
- On the job
- 4 h 30 min
- Trigger time
- 1 h 30 min
The tools ran in the hands for 1 h 30 min of the 4 h 30 min on the job. That is 30 min of breaker in short bursts and 1 h of compactor. Only this time goes into the sum.
Showing the whole morning.
Count only the time the tool is running
Trigger time is how long the hands are on the tool while it is vibrating. It may be only a few minutes in several hours of work with the tool. In the lesson’s morning the breaker is out for 75 minutes and runs for about 30.
How to find it on site
People are unlikely to estimate their own trigger time accurately. Watch the work for about half an hour and scale it up to the whole task or shift. For a repeated job, such as drilling holes, time a few and multiply by the number done in a shift.
A longer watch gives a better estimate. Time each tool the person uses, not only the one that seems worst.
Half an hour of breaking out, watched
08:01 to 08:31, one square a minute. Hatched squares are minutes with the breaker running.
- 12 ÷ 30
- 12 running minutes in 30 watched is 40%.
- 40% × 75
- 40% of the 75 minutes breaking out is 30 minutes.
- About 30 min
- The breaker’s trigger time for the morning.
Why double the vibration gives four times the points
Points follow the square of the vibration. At the same trigger time, twice the vibration gives four times the points.
Draw the vibration as the side of a square. Double the side and the square holds four of the small ones. Each small square here is 50 points, which is 5 m/s² for one hour.
That is why one tool can outweigh the rest of a day. In the lesson the breaker runs for half as long as the compactor and still gives twice the points.
50 points 5 m/s² for one hour
200 points 10 m/s² for the same hour
| Vibration, m/s² | 3 | 4 | 5 | 6 | 7 | 10 | 12 | 15 |
|---|---|---|---|---|---|---|---|---|
| Points an hour | 18 | 32 | 50 | 72 | 98 | 200 | 288 | 450 |
HSE’s own table rounds these to 20, 30, 50, 70, 100, 200, 300 and 450. Multiply by the hours of trigger time.
Add up every tool one person uses
Points belong to the person, not the tool. Work out each tool’s points from its trigger time, then add them for that person’s day. The lesson’s morning comes to 150 points. Nothing vibrating is used after 12:00, so that is the whole day. A tool used in the afternoon would add to it.
Breaker, lesson figure 10 m/s²
200 points an hour × ½ hour = 100 points.
Compactor, lesson figure 5 m/s²
50 points an hour × 1 hour = 50 points.
150 points for the day
| Time | What happened | Adds | Running total |
|---|---|---|---|
| 07:45 to 09:00 | Breaker, 30 min trigger time at the lesson figure of 10 m/s² | 100 | 100 |
| 09:45 to 10:00 | Tea break. No new points, and none taken away. | 0 | 100 |
| 10:15 to 12:00 | Vibration-reduced plate compactor, 1 h trigger time at the lesson figure of 5 m/s² | 50 | 150 |
What 150 points asks of the employer
150 is above the exposure action value of 100 and below the exposure limit value of 400.
- Reduce exposure to as low as is reasonably practicable.
- Provide health surveillance, which applies at or above 100.
- Give information, instruction and training on the risk and how it is controlled.
- Never let the day go above 400. It is a limit, not an allowance to use up.
Below 100 the risk still has to be reduced to the lowest level reasonably practicable. Some people develop symptoms at low exposures, and anyone who already has HAVS needs protecting below 100 too.
The same day as eight steady hours
HSE also writes daily exposure as A(8), the steady vibration that would give the same exposure over eight hours.
√(150 ÷ 16) = 3.06 m/s² A(8)
The action value is 2.5 m/s² A(8), which is 100 points. The limit value is 5 m/s² A(8), which is 400 points.
How a change in the work changes the points
Halving the vibration quarters the points an hour. So half the vibration for twice the time gives half the points, and for four times the time the same points.
Two ways to do the same job, with figures made up for the comparison.
One way
- Vibration
- 10 m/s²
- Trigger time
- 1 h
200 points
Another way
- Vibration
- 5 m/s²
- Trigger time
- 2 h
100 points
If the other way took 4 hours
- Vibration
- 5 m/s²
- Trigger time
- 4 h
200 points
HSE names two ways to cut exposure, less vibration reaching the hands and less time holding the vibrating tool. Work out the points both ways before choosing.
Where the vibration figure comes from
The same work gives very different points depending on the figure used. The same 30 min of breaking out comes to anything from 49 to 324 points across HSE’s range for breakers.
- HSE’s figure
- A typical figure and range for each type of tool. Breakers run from 7 to 18 m/s², with 14 as HSE’s recommended initial value.
- The maker’s declared figure
- From the tool’s handbook, measured in a standard test. Check it represents how the tool is used. Some of this data underestimates vibration at work substantially.
- A measurement
- Taken on the tool as it is used on the job.
At HSE’s recommended initial value of 14 m/s², the breaker alone is 196 points and the lesson’s morning 246. The calculator starts from HSE’s figure and takes a maker’s declared figure or your own instead.
What to write down
Record each tool’s figure and trigger time, and where each came from. Then the points, the day’s total and what that level asks. Anything needed to comply with the law goes in an action plan, with what has been done, what will be done, a timetable and who is responsible.
| Tool | Vibration figure | Trigger time | Points |
|---|---|---|---|
| Breaker | 10 m/s²Lesson figure | About 30 minHalf an hour watched, scaled to the 75 minutes breaking out | 100 |
| Vibration-reduced plate compactor | 5 m/s²Lesson figure | 1 hSix runs of 10 minutes, timed | 50 |
| The day | 3.06 m/s² A(8) | 1 h 30 min | 150 |
Work out your own day
Enter each tool and its trigger time. The calculator uses HSE’s figures or makers’ declared figures and adds up the day.
The example opens in a new tab, so a day you are working on stays as it is.