Scaffolding RAMS example

Worked examples for common jobs, written with our builder. Read, download, adapt.

Build your own

Choose a job

Scaffolding RAMS example

Erecting an independent tied scaffold on a two-storey house

Independent tube and fitting scaffold to a TG20 compliance sheet, family at home, rescue kit on the wagon.

What to change

  • Company, people, site and dates
  • Lifts, height and what the users will load on it
  • Wall construction and ties
  • Pavement or road: licence and public protection
  • Overhead lines
  • Rescue plan and kit
  • Emergency arrangements

Sources

Checked

  1. ComplyOnSitecomplyonsite.comWORKED EXAMPLE: RISK ASSESSMENT AND METHOD STATEMENTErecting an independent tied scaffold on atwo-storey houseHollins & Reed Scaffolding Ltd · 12 to 13 October 2026 · In charge: Dan HollinsWorked example. Change it to fit your job before you use it.Job detailsCompanyHollins & Reed Scaffolding LtdSite and work area7 Orchard Close, StockportPlanned dates12 to 13 October 2026CustomerMr and Mrs BarlowIn charge on siteDan HollinsTeamThree scaffolders: Dan Hollins leads and checks the scaffold beforehandover; Tom Ellis and Priya Shah work with him.WorkErecting an independent tied scaffold on a two-storey housePrepared byDan HollinsSignatureDateWork and boundariesErecting. Areas: Front and gable elevations, ground to eaves, two lifts; Pavement outside No. 7, keptbehind barriersWorking arrangementErection fall protection: Advance guardrail system.Other people will be using the area.Independent tied scaffold to a TG20 compliance sheet: two lifts, general purpose 2 kN/m², nosheeting. The family stays at home; the front door stays clear as their way out. The exclusionzone and public protection go up before anything comes off the wagon. The highway licence forthe pavement is held. Overhead lines were checked on the survey. The first-lift ladder comes offout of hours.Worked example. Change it to fit your job before you use it.Page 1 of 6
  2. Example: Erecting an independent tied scaffold on a two-storey houseComplyOnSiteEmergency arrangementsFall into a harness: Tom Ellis and Priya Shah recover the person from the lift above, using the rescuekit on the wagon. 999 comes second: do not wait for them to do the rescue. Anyone hurt on the pathor road: stop work, keep people away, close the bay. Scaffold touching an overhead line: stay clear,nobody touches the tube, ring the line owner. Scaffold moving or collapsing: everyone off and keeppeople away. Fire in the house: the family leaves by the front door. First aider: Tom Ellis, kit on thewagon. Dan Hollins rings 999, gives 7 Orchard Close, and meets the crew at the main road junction.Planned method1Set up the work areaConfirm the work area and scope before starting. Keep other people outside the active workarea. Keep entrances and escape routes clear.2Keep people clear of the workAgree how people get past or around the work while it is going on. Put barriers or signs wherea route crosses the work. Do not leave open work unattended.3Check the sheet or design firstKeep the TG20 sheet, maker instructions or design on site. Brief the gang on the build orderand how they will stay protected.4Set the boundary before work startsFence off the base and the area below the work. Protect any public route, traffic route oroverhead line beside it.5Check for asbestos before you disturb anythingCheck the asbestos survey covers exactly what you will disturb, to the full depth. Register only,or nothing: get a refurbishment survey or a sample first. Read what it says about old boards,soffits, sealants or insulation where ties and fixings go. No survey, or a material you do notrecognise: stop and get it checked.6Find and isolate hidden servicesFind cables and pipes before you disturb anything: drawings, then a detector. Mark what youfind. Not sure what is there? Turn the supply off, or do not start. Have cables and gas isolatedby the right person and prove them dead before you start.7Check the weather before you startDo not lift or fix scaffold and loose materials in strong wind. Stop in heavy rain, ice or lightning.8Stop things falling on people belowKeep people out of the area below the work so nobody walks under the tubes, boards, fittingsand tools. Keep toe boards and guards in place on any platform, and lanyard tools where youcan.Worked example. Change it to fit your job before you use it.Page 2 of 6
  3. Example: Erecting an independent tied scaffold on a two-storey houseComplyOnSite9Unload and stack on the agreed areaTake nothing off the wagon until the boundary is up. Stack it on the agreed area and protectthe pavement.10Set a firm, level basePut sole boards and base plates under every standard where the ground needs support. Checkthe ground or supporting structure before building up.11Build the base lift with fall protectionNobody steps onto a new lift until the fall method in this document is in place. Board the lift andfit guardrails and toe boards before it is used. Anyone within 1 m of an unprotected edge clipson.12Use advance guardrailsFit the advance guardrail from the lift below before anyone steps onto the new lift. Keep it inplace until the lift is boarded and its own guardrails are in.13Tie and brace the base liftInstall the planned ties and bracing in the order shown on the sheet or design. Keep every tiewithin its stated safe working load.14Fit the access ladder and secure itFit it once the base lift is tied, before anyone works from that lift. It goes 1 m above the landing,at 65 to 75 degrees, and is tied. Out of hours, remove the bottom ladder or board it off.15Use the hoistCheck the hoist's thorough examination report is in date and it can take the weight. Keeppeople out from underneath while a load is up.16Repeat for each liftFor every lift, raise the materials by the agreed route, fit the fall protection, board it, then tieand brace it. Take the ladder up with the build, so nobody climbs the frame.17Block off what is not finishedMark any part that is not finished and physically block the way onto it. Do this before leavingsite, as well as during the work.18Inspect before handing it overCheck the finished scaffold, access, boards, guardrails, ties, toe boards and loadingarrangements. Record the inspection and hand it over with the current tag or record visible.19Clear and hand back the areaRemove tools, waste and unused materials. Check the area is clean and ready to use. Tell thecustomer or whoever runs the site when the work is complete.Worked example. Change it to fit your job before you use it.Page 3 of 6
  4. Example: Erecting an independent tied scaffold on a two-storey houseComplyOnSiteRisk assessmentHazardWho might beharmed and howControls in placePeople entering thework area or trippingover materialsStep 1Workers,occupants andvisitorsMark or barrier the active work area. Store tools and materialsaway from access routes.People using thebuilding or passingby walking into thework or over what itleavesStep 2Occupants,visitors, membersof the public andworkersKeep the barriers and signs up while the work is active. Givepeople a clear way round where their normal route is blocked.A scaffold builtoutside its designcan collapse orexpose the gang tofallsStep 3Scaffolders andpeople near thebuildUse a supervisor who knows the type and size of scaffold.Stop if the scaffold or site does not match the sheet or design.People or vehiclesenter the scaffoldwork area or a tubereaches a live lineStep 4Scaffolders, otherworkers, thepublic and driversUse barriers, signs and a banksman where the site needs them.Keep the agreed clearance from overhead lines.Breathing asbestosfibres from oldboards, sheets,sealants or insulationStep 5The team andanyone in thebuildingDo not cut, drill or break any material until it is confirmedasbestos free. Licensed work is not for this method; hand it toa licensed contractor.Hitting a live cable orgas pipe causesshock, fire or gasescapeStep 6The person doingthe work andeveryone nearbyCheck again wherever the work moves. If you hit something,stop, keep clear and report it.Wind catches thescaffold and loosematerials or blowssomeone off balanceat heightStep 7The team andpeople belowAgree a wind limit for this work and check the forecast beforeyou start. Tie down or take in loose materials before you leave.Tubes, boards,fittings and toolsfalling onto peoplebelowStep 8People belowBring waste down by hand or in bags. Never throw it. Keep theexclusion zone up until the last item is down.Worked example. Change it to fit your job before you use it.Page 4 of 6
  5. Example: Erecting an independent tied scaffold on a two-storey houseComplyOnSiteHazardWho might beharmed and howControls in placeTubes or boards fallon someone, or thewagon reverses intothemStep 9Scaffolders andthe publicUse a banksman if the wagon reverses. Nothing passes overpeople.Settlement oroverturning from aweak, uneven orundermined baseStep 10Scaffolders andpeople nearbyProvide extra support where the ground or structure cannotcarry the scaffold and its loads. Keep the base safe fromvehicles and excavations.A scaffolder fallswhile the next lift isbeing builtStep 11ScaffoldersUse collective protection first. Do not free climb or step onto anunprotected lift.The fall-protectionmethod is not usedas the scaffold risesStep 12ScaffoldersStop if this job's system is not available or suitable. Neverreplace collective protection with free climbing.The scaffold movesor collapses before itis stableStep 13Scaffolders andpeople belowDo not build beyond the last permitted tie. Keep incompletelifts out of use.Someone climbs thescaffold out of hours,or falls using a looseladderStep 14Scaffolders, usersand members ofthe publicCheck the ladder is removed or boarded before anyone leavessite.A load falls from thehoist onto someonebelowStep 15People below thehoistSecure the scaffold materials before the lift. One personcontrols the lift and everyone can hear them.A fall from anunprotected lift, orfrom climbing theframe to reach itStep 16The scaffoldersDo not free climb. Finish one lift before starting the next.Someone walks ontoan unfinished liftStep 17Other trades andanyone on siteovernightKeep incomplete lifts out of use.Other trades use anincomplete orunsuitable scaffoldStep 18Scaffold users andpeople belowKeep it closed until the inspection is passed. Correct defectsbefore other trades use it.Worked example. Change it to fit your job before you use it.Page 5 of 6
  6. Example: Erecting an independent tied scaffold on a two-storey houseComplyOnSiteHazardWho might beharmed and howControls in placeDebris, tools orunfinished work leftin the areaStep 19Workers,occupants andvisitorsRemove waste by the agreed route. Record and protect anyunfinished work.Worked example. Change it to fit your job before you use it.Page 6 of 6

Method statement and risk assessment, side by side

Method statement The work in order, step by step.
Risk assessment Each hazard, who could be harmed, the controls in place and any further action.

Use an example, then make it yours

HSE says not to just copy an example and put your company name on it: that would not satisfy the law or protect your people.

The builder asks about your site and rewrites the hazards and steps.

RAMS example questions

Are these real jobs?

No. Every job, company, person and address here is made up. Each one is a worked example written with our builder, and every page says so.

Can I use one as it is?

No. Your site, your people and your emergency arrangements will be different. Change it to fit your job before anyone works to it.

Why do they carry ComplyOnSite branding?

They are made with our builder and printed in its standard design. A RAMS you build yourself carries your company name.

Word or PDF?

Both. Word if you will change the wording yourself, PDF to read or print. Or press Use this and edit it in the builder, then download your own copy.

Where is the blank?

On the RAMS template page. These examples are all filled in.

How were they checked?

Each one is read against published guidance, mainly from HSE, for its facts, the order of the work and its emergency arrangements. The sources are listed beside it. If a document changes, it comes off this page until it has been checked again. The check covers the example, not your job.