Strip and reroof RAMS example

Worked examples for common jobs, written with our builder. Read, download, adapt.

Build your own

Choose a job

Strip and reroof RAMS example

Stripping and re-tiling a pitched roof from a scaffold

Lived-in house, tiles, battens and underlay off, one section made weathertight each day.

What to change

  • Company, people, site and dates
  • Slate or clay rather than concrete tile
  • Bat records and nesting birds
  • Tile loading agreed with the scaffolder
  • Fragile rooflights, conservatories or lean-tos
  • Building control and the insulation rules
  • Emergency arrangements

Sources

Checked

  1. ComplyOnSitecomplyonsite.comWORKED EXAMPLE: RISK ASSESSMENT AND METHOD STATEMENTStripping and re-tiling a pitched roof from ascaffoldHollins & Reed Roofing Ltd · 12 to 23 October 2026 · In charge: Dan HollinsWorked example. Change it to fit your job before you use it.Job detailsCompanyHollins & Reed Roofing LtdSite and work area22 Mill Lane, M33Planned dates12 to 23 October 2026CustomerMs PatelIn charge on siteDan HollinsTeamThree roofers: Dan Hollins leads and checks the forecast each morning;Tom Ellis and Priya Shah work with him. Tom is the first aider.WorkStripping and re-tiling a pitched roof from a scaffoldPrepared byDan HollinsSignatureDateWork and boundariesStrip the whole roof, fit replacement covering. Areas: Main roof, front and rear slopes; Skip andchute landing on the driveWorking arrangementAccess: a scaffold.Working height: eaves about 5 m, ridge about 8 m, from an independent scaffold on allelevations, handed over and tagged; platform within 300 mm of the eaves.Ground or floor: block paved drive and garden.Dust control when cutting: Water on the blade.Other people will be using the area.The family stays at home; the loft and front path are closed to them. Waste goes down a rubblechute to the skip; tiles are never thrown. We strip only what can be made weathertight that day.Worked example. Change it to fit your job before you use it.Page 1 of 8
  2. Example: Stripping and re-tiling a pitched roof from a scaffoldComplyOnSiteBats and nesting birds were checked before work. The re-roof is notified to building control. Oldbattens are not footholds or anchors unless a competent person has checked them, and boardsor nets stop falls through the opened roof. Tile loading per bay is agreed with the scaffolder.Emergency arrangementsVoice alarm on the scaffold: shout “stop”. Fall from the eaves or through the opened roof: stopwork; Tom Ellis climbs by the bay 3 ladder with the kit; we do not wait for 999 to reach someone ona roof, in the loft or on a lift. Do not move someone with a back or neck injury unless they are indanger. Sudden wind or rain: sheet down and secured, or leave it and get off the roof. Bat found:stop in that area, leave it, ring the National Bat Helpline and the office. Water coming into rooms: tellthe householder, power off to those circuits, sheet up. Tile or debris hits anyone: stop, first aid, keepthe path shut. First aid kit in the van cab. Priya Shah rings 999, gives 22 Mill Lane, M33, and meetsthe crew on the drive.Planned method1Set up the work areaConfirm the work area and scope before starting. Keep other people outside the active workarea. Keep entrances and escape routes clear.2Keep people clear of the workAgree how people get past or around the work while it is going on. Put barriers or signs wherea route crosses the work. Do not leave open work unattended.3Plan the strip in sectionsWrite down the layers being removed, the order and the points where the team will stop andcheck. Brief who holds each piece, where it goes and how the area below stays protected.4Check for asbestos before you disturb anythingCheck the asbestos survey covers exactly what you will disturb, to the full depth. Register only,or nothing: get a refurbishment survey or a sample first. Read what it says about the old roofcovering, underlay and insulation. No survey, or a material you do not recognise: stop and getit checked.5Find and isolate hidden servicesFind cables and pipes before you disturb anything: drawings, then a detector. Mark what youfind. Not sure what is there? Turn the supply off, or do not start. Have cables and gas isolatedby the right person and prove them dead before you start.6Check the weather before you startDo not lift or fix roof coverings and temporary sheeting in strong wind. Stop in heavy rain, iceor lightning.7Check the roof build-up before opening itConfirm the covering, underlay, battens and supports match the information for the job. Stop ifthe layer or support is different from what was expected.Worked example. Change it to fit your job before you use it.Page 2 of 8
  3. Example: Stripping and re-tiling a pitched roof from a scaffoldComplyOnSite8Stop things falling on people belowKeep people out of the area below the work so nobody walks under the roof coverings, toolsand waste. Keep toe boards and guards in place on any platform, and lanyard tools where youcan.9Work from the scaffoldCheck the scaffold tag or handover shows an inspection within the last 7 days. Use only thelifts and access that were handed over. Keep materials within the loading the scaffold was builtfor. Keep off in high wind or ice, or when sheeting has come loose.10Use the hoistCheck the hoist's thorough examination report is in date and it can take the weight. Keeppeople out from underneath while a load is up.11Protect the area belowClose and segregate the area below, or put the planned temporary protection in place beforestripping. Keep the protection in place until the section is closed and the waste is down.12Strip one roof section at a timeWork in the agreed sequence and keep the remaining roof supported while each section isopened. Remove loose pieces before moving to the next section.13Weatherproof each open sectionRe-cover the section the same day or fix the planned temporary sheeting before leaving it.Check the cover is secure and will not let rain into the building.14Take off lead flashings with lead controlsHandle old lead flashings in gloves and disposable overalls. Wash your hands and face beforeeating, drinking or smoking.15Lower and stack stripped materialsLower tiles, slates, battens and waste by the agreed route; never throw them from the roof.Stack reusable material safely and keep waste clear of edges and access routes.16Brief the roof teamConfirm the covering, roof-system instructions, access and handover checks before layingstarts. Stop if the supplied system differs from the brief.17Check the prepared roof supportsCheck the rafters, support lines and fixing points before fitting the new roof system. Stop if thesupports are damaged, loose or different from the design.18Lay the underlayInstall the specified underlay before the battens. Keep the eaves and ridge layout to the roofsystem.19Fix the battens to the designSet out the batten gauge from the eaves to the ridge. Fix battens to the prepared rafters asspecified.Worked example. Change it to fit your job before you use it.Page 3 of 8
  4. Example: Stripping and re-tiling a pitched roof from a scaffoldComplyOnSite20Load out the tiles evenlySpread the tiles in small stacks along the battens and the scaffold. Keep within the loadingagreed with the scaffolder and what the roof can carry.21Control the dust when cuttingCut tiles in one set area on a sacrificial board, never dry. Wear an APF 20 mask (FFP3 or P3)when you cut: fit tested and clean-shaven. Keep other people out of the dust.22Wet cuttingThis job is wet cutting: keep water on and collect the slurry.23Use the grinder or disc cutter safelyCheck the disc is the right type and speed for the tool and the material. Keep the guard on andboth hands on the tool. Wear impact-rated eye protection.24Limit noise and vibrationWear ear defenders when cutting. Note how long each person's hands are on each tool while itruns. Take the tool's vibration figure from the maker or HSE's table and check it fits how youuse it. Points per hour times hours on the trigger, added up for the day, gives the exposure:100 points is the action value, 400 is the limit. HSE's vibration calculator does the sum. Over100, cut it with lower-vibration kit or less time, and never pass 400. Write the result down.Sharing the work does not replace this. Keep the tools maintained.25Lay the covering from the eavesStart at the eaves and work in the specified rows. Use the product's fixing method as eachcourse is laid.26Fit the flashingsFit lead flashings at every abutment and chimney, to the roof system and the design. Handlelead in gloves and wash before eating, drinking or smoking.27Check alignment, overlap and edgesCheck each course against the roof lines and specified overlap. Complete the ridge, verge andeaves details before handover.28Clear the gutters and sign the roof offCheck the roof is weathertight, clear the gutters and take down any hoist. Sign the roof off withthe customer, and with building control where the job needs it, then hand the scaffold back forstriking.29Clear and hand back the areaRemove tools, waste and unused materials. Check the area is clean and ready to use. Tell thecustomer or whoever runs the site when the work is complete.Worked example. Change it to fit your job before you use it.Page 4 of 8
  5. Example: Stripping and re-tiling a pitched roof from a scaffoldComplyOnSiteRisk assessmentHazardWho might beharmed and howControls in placePeople entering thework area or trippingover materialsStep 1Workers,occupants andvisitorsMark or barrier the active work area. Store tools and materialsaway from access routes.People using thebuilding or passingby walking into thework or over what itleavesStep 2Occupants,visitors, membersof the public andworkersKeep the barriers and signs up while the work is active. Givepeople a clear way round where their normal route is blocked.An unplanned stripdestabilises the roofor exposes people touncontrolled debrisStep 3Roofers, othertrades and thepublicUse a written method from a competent person. Stop if theroof build-up differs from the method.Breathing asbestosfibres from oldboards, sheets,sealants or insulationStep 4The team andanyone in thebuildingDo not cut, drill or break any material until it is confirmedasbestos free. Licensed work is not for this method; hand it toa licensed contractor.Hitting a live cable orgas pipe causesshock, fire or gasescapeStep 5The person doingthe work andeveryone nearbyCheck again wherever the work moves. If you hit something,stop, keep clear and report it.Wind catches theroof coverings andtemporary sheetingor blows someoneoff balance at heightStep 6The team andpeople belowAgree a wind limit for this work and check the forecast beforeyou start. Tie down or take in loose materials before you leave.An unexpected layeror weak support failswhen the roof isopenedStep 7Roofers andpeople belowCheck a small area before committing to the strip. Do not alterthe structure as part of this method.Roof coverings, toolsand waste fallingonto people belowStep 8People belowBring waste down by hand, in bags or by the chute. Neverthrow it. Keep the exclusion zone up until the last item is down.Worked example. Change it to fit your job before you use it.Page 5 of 8
  6. Example: Stripping and re-tiling a pitched roof from a scaffoldComplyOnSiteHazardWho might beharmed and howControls in placeFalling from ascaffold that hasbeen altered;materials falling fromthe scaffoldStep 9Anyone workingon the lift, where aguardrail, board ortie has been takenout to get the workdone. Anyonepassing or workingunderneath,including thepublic where thescaffold is over afootpath.Never remove boards, ties, guardrails or bracing; ask thescaffolding contractor to alter it. Report damage or a missingtag and keep off until it is checked. Fit brick guards or nettingwhere materials could fall on people below.A load falls from thehoist onto someonebelowStep 10People below thehoistSecure the roof materials before the lift. One person controlsthe lift and everyone can hear them.Debris, water or toolsenter the area belowthe open roofStep 11People in thebuilding andpeople belowKeep people out of the drop area. Stop if the protection belowis missing or damaged.Loose roof materialsfall or the remainingroof becomesunstableStep 12Roofers andpeople belowKeep the edge protection and exclusion area in place. Do notleave loose tiles, slates or battens at the roof edge.Rain enters thebuilding or wind liftstemporary sheetingStep 13Roofers andbuilding occupantsCheck the forecast before opening the roof. Stop if thetemporary cover cannot be fixed securely.Swallowing lead fromdust on hands andclothingStep 14The roofershandling theflashingsKeep food and drink away from the work. Take the overalls offbefore going to the van.Roof waste falls orheavy materialscause injury duringhandlingStep 15Roofers, labourersand people belowUse the planned lifting aid and exclusion zone. Keep the routeclear before each load moves.A worker uses thewrong method orworks without therequired roofprotectionStep 16Roofers andpeople belowUse trained and competent workers. Keep the agreed roofprotection in place.Worked example. Change it to fit your job before you use it.Page 6 of 8
  7. Example: Stripping and re-tiling a pitched roof from a scaffoldComplyOnSiteHazardWho might beharmed and howControls in placeThe new coveringlacks support or itsfixings failStep 17Roofers andbuilding occupantsGet a repair or support decision before covering damagedareas. Do not guess a fixing into a weak support.Water enters or thecovering lacks itsdesigned supportStep 18Roofers andbuilding occupantsUse the manufacturer's spacing and gauge. Do not guess abatten size or lap.Battens move or thecovering hasinadequate supportand lapStep 19RoofersCheck the batten grade, gauge and fixing before laying. Stop ifthe prepared supports do not match the roof system.Stacked tilesoverload a scaffoldbay or the roof, orslide offStep 20Roofers andpeople belowDo not stack over the toe board without brick guards. Keep thestacks clear of the edge.Silica dust frompower cuttingdamages the lungsStep 21The person cuttingand anyonedownwindCut in one place, away from other trades. Collect any slurrywhile it is wet. Clear any dry dust with an H or M Class vacuum,not a brush.Silica dust if thewater stops, andslipping on slurryStep 22The person cuttingand anyonenearbyStop cutting if the water stops.A disc bursts or thetool kicks back andcuts the userStep 23The person cuttingOnly someone trained to change discs fits them. Stop andswap any cracked or worn disc.Hearing damage andhand-arm vibrationfrom power toolsStep 24The person cuttingUse sharp blades and discs, which cut faster with lessvibration. Warn people nearby before you start cutting.Tiles or slates slip,fall or leave gaps thatadmit waterStep 25Roofers andpeople belowKeep the roof access and edge protection in place. Do notleave loose units where wind can move them.A gap at an abutmentor chimney lets waterinto the buildingStep 26Roofers andbuilding occupantsCheck nothing taken off in the strip has been left off. Do notclose a section with a flashing still missing.Worked example. Change it to fit your job before you use it.Page 7 of 8
  8. Example: Stripping and re-tiling a pitched roof from a scaffoldComplyOnSiteHazardWho might beharmed and howControls in placeA misaligned orunder-lappedcovering leaks or islifted by windStep 27Roofers andbuilding occupantsUse the specified overlap and fixing schedule. Record anyincomplete detail instead of handing back the roof.Blocked gutters or anunchecked roof leakafter the scaffold hasgoneStep 28Building occupantsand the roofersKeep the scaffold up until the roof is signed off. Recordanything left to finish.Debris, tools orunfinished work leftin the areaStep 29Workers,occupants andvisitorsRemove waste by the agreed route. Record and protect anyunfinished work.Worked example. Change it to fit your job before you use it.Page 8 of 8

Method statement and risk assessment, side by side

Method statement The work in order, step by step.
Risk assessment Each hazard, who could be harmed, the controls in place and any further action.

Use an example, then make it yours

HSE says not to just copy an example and put your company name on it: that would not satisfy the law or protect your people.

The builder asks about your site and rewrites the hazards and steps.

RAMS example questions

Are these real jobs?

No. Every job, company, person and address here is made up. Each one is a worked example written with our builder, and every page says so.

Can I use one as it is?

No. Your site, your people and your emergency arrangements will be different. Change it to fit your job before anyone works to it.

Why do they carry ComplyOnSite branding?

They are made with our builder and printed in its standard design. A RAMS you build yourself carries your company name.

Word or PDF?

Both. Word if you will change the wording yourself, PDF to read or print. Or press Use this and edit it in the builder, then download your own copy.

Where is the blank?

On the RAMS template page. These examples are all filled in.

How were they checked?

Each one is read against published guidance, mainly from HSE, for its facts, the order of the work and its emergency arrangements. The sources are listed beside it. If a document changes, it comes off this page until it has been checked again. The check covers the example, not your job.