Skip to content

Scaffold handover certificate

A digital scaffold handover on your phone. Both firms sign and the next firm gets the exact PDF.

  • Free, no account
  • Works on one bar of signal
  • Blank PDF to print

 

The top of a filled scaffold handover certificate for 14 Mill Lane, Leeds. General purpose duty, 2.0 kN/m², 2 lifts at a time, and the restrictions in large type.
A worked example. Open the PDF

What goes on a handover certificate

One page the next trade can read at a glance, with the loading and restrictions largest.

  1. The scaffoldThe site, which scaffold or section, its type, boarded lifts, and when it was handed over. New, part or an alteration.
  2. Loading and restrictionsThe duty with its load in kN/m², how many lifts may be loaded at once, and the restrictions in large type, so the next trade reads them first.
  3. Built toThe TG20 compliance sheet or design drawing number, the ties and whether they were tested, and any netting, sheeting or brick guards.
  4. Inspection before first useOptional. Tick it when the handover is also the inspection, and the certificate prints what Schedule 7 asks for.
  5. Both peopleWho handed it over with their CISRS card and phone, who received it, and both signatures with the time.
  6. PhotosUp to four, on a second page, each with its caption.

See the worked example or print the blank.

Sending it to the next firm

They get the exact certificate you issued, and never need an account.

  • Share the PDFWhatsApp, text or anything else on your phone. They get the file itself, no link to open and no account.
  • Send for signatureIf they are not beside you, send a link. They download the certificate first, then sign on their own phone if they choose, and both of you get the signed copy.
  • Print itDownload the PDF and print it for the site file or the scaffold.

No regulation uses the words handover certificate. The Work at Height Regulations 2005 ask for three things a handover usually carries.

  • A scaffold is not used after it is put up until it has been inspected where it stands (regulation 12, paragraph 2).
  • A scaffold one firm puts up and another firm uses comes with physical evidence of its last inspection (paragraph 5).
  • Where someone could fall 2 metres or more, the inspector writes a report before the end of the shift and gives a copy within 24 hours. Schedule 7 lists what it says (paragraph 7).

Once it is handed over, the firm whose people use the scaffold makes sure it is inspected. Where someone could fall 2 metres or more, that is within every 7 days, and after an alteration, bad weather or anything else that could affect it (paragraphs 3 and 4).

A handover certificate is how the industry passes on what the scaffold is built for and who put it up, as the NASC describes in its guidance SG35. Many firms make the handover their first inspection. Tick Inspection before first use and this certificate prints the Schedule 7 details too. In Northern Ireland the same details are in Schedule 8 of the Northern Ireland regulations.

TG20 on a handover

TG20 is the NASC’s guide to tube and fitting scaffolds. A TG20 compliance sheet shows a scaffold is a standard arrangement that needs no design of its own. A system scaffold can follow its maker’s standard configurations instead. Anything outside those needs a design of its own, and the handover names its drawing.

Choose what the scaffold was built to and type the sheet or drawing number. The certificate prints it beside the ties and tie tests.

Questions

Do I need an account?

No. Fill it in, sign and share the PDF. The certificate stays on your phone. The person receiving it needs nothing but the file or the link.

What if there is no signal at the scaffold?

Open the page while you have signal and it gets ready straight away. Then it fills in, signs and makes the PDF without signal. Sending waits until you have a bar.

Can the other firm sign on my phone?

Yes. Hand the phone over at the last step. Or send a link and they sign on their own phone.

Can I issue it with gaps?

Yes. Nothing is required. Before you issue, the page lists what was left blank, and the certificate prints Not stated where loading or restrictions are empty.