How often should scaffolding be inspected?

Before first use, after a substantial alteration, and after anything that could have made it unsafe, such as high winds or a vehicle strike. A construction platform with a fall of 2 m or more can’t be used unless it was inspected in the previous 7 days, so in practice it’s weekly.

A competent person inspects it and the result is recorded. For those construction platforms the report is written before the end of the shift, and the site keeps it until the work is finished, then for 3 months.

Work at Height Regulations 2005, regulation 12. The Northern Ireland regulations say the same.

When a scaffold needs inspecting

The 7 days are a limit on use. Each time someone works on a construction platform with a fall of 2 m or more, it must have been inspected in the 7 days before. Anything that could have made it unsafe since needs another inspection first.

What happenedWhat it needs
Put up, or handed overInspected before anyone uses it. A recorded handover inspection can be the first one.
7 days since the last inspectionInspected again before the next use, if it is a construction platform with a fall of 2 m or more.
Substantially altered, such as ties moved, a lift added or boards taken upInspected before use.
High winds, storm, flooding, a vehicle strike or ground movement that could have made it unsafeInspected before use.
Long exposure or harsh conditions wearing it downInspected as often as that needs, which can be more than weekly.
Work restarting after a stopInspected before use if anything could have changed, or, for a construction platform from 2 m, if the last one was more than 7 days ago.

One scaffold’s month

  1. Handed over

    The handover inspection is recorded as the first inspection.

  2. 7 days on

    Inspected again before work starts.

  3. High winds overnight

    Sheeting and ties may have worked loose, so a competent person inspects it before anyone goes up.

  4. 7 days from Wednesday

    Wednesday’s was a full inspection, so the 7 days now run from it, not from Monday.

  5. A lift moved for the bricklayers

    Altered by the scaffolders, then inspected before use.

  6. Back after a two-week shutdown

    Inspected before work restarts.

Below 2 m, and mobile towers

A platform with a smaller fall still needs inspecting after it is put up, at suitable intervals and after anything that could make it unsafe. Each result is recorded and kept until the next result is recorded. The 7-day limit, the eight-part report and keeping it for 3 months apply to construction platforms with a fall of 2 m or more.

A fixed scaffold is inspected in the position where it is used. A mobile tower used for construction with a fall of 2 m or more must have been inspected on that site within the 7 days. A tower taken down and rebuilt is inspected in its new position before use.

From Work at Height Regulations 2005, regulation 12, HSE, Work at height FAQs (construction) and HSE, Scaffolds.

Is a daily check the same as an inspection?

No. The employer makes sure the platform and guardrails are checked each time before use, as far as is reasonably practicable. That check is separate from the inspection and its report.

What a look before use covers

  • A safe way up, preferably a staircase or ladder tower
  • Platforms fully boarded, no boards missing, loose or overhanging too far
  • Guardrails and toe boards on every open edge
  • Loading bay fall protection in place
  • No sign of movement, damage or missing ties since the last inspection

If part of it isn’t safe

Keep everyone out of the affected area and tell the person in charge of your work. If it could affect the whole scaffold, such as a missing tie or a vehicle strike, nobody uses any of it until a competent person has inspected it and anything unsafe has been put right.

A scaffold, or part of one, that is not available for use is marked with warning signs and barred off so nobody can get into the danger zone.

A scaffold tag shows the last inspection at a glance. It is not a legal requirement and it does not replace the report.

From Work at Height Regulations 2005, regulation 13, Work at Height Regulations 2005, regulation 14, Work at Height Regulations 2005, Schedule 3, HSE, Scaffolds and HSE, Work at height FAQs (construction).

Who can inspect a scaffold?

A competent person, whose knowledge, training and experience suit the type and complexity of the scaffold. The scaffold’s user or hirer makes sure it happens.

  • Basic scaffold. A site manager or supervisor who has done a scaffold inspection course and has the background experience can inspect it.
  • System scaffold. Someone trained on that system under the manufacturer’s or supplier’s scheme.
  • Complex scaffold, such as a cantilever, loading bay or temporary roof. Someone with matching experience, often an advanced scaffold inspector.

CISRS scaffold inspection training, basic or advanced, is a common way to show competence. The law asks for competence, not a particular card. The user can have the scaffolding contractor do the inspections.

What the inspection looks at

The whole scaffold, against how it was meant to be built. The ground and base plates, standards and their connections, bracing and ties, platforms and boards, guardrails and toe boards, access and loading bays, the load on it, and any sheeting or netting. The inspector decides how closely to look and whether anything needs testing.

From HSE, Scaffolds, HSE, Work at height FAQs (construction), Work at Height Regulations 2005, regulation 5 and Work at Height Regulations 2005, regulation 12.

What a scaffold inspection report must include

Eight things. A defect put right during the inspection still goes in, with what was done.

Scaffold inspection report Example
Who it was done for, with their address
Example Build Ltd, 4 Canal Street, Leeds LS1 4AB
Where the scaffold is
14 Mill Lane, front elevation
What the scaffold is
Independent tied scaffold, 4 lifts, general purpose
Date and time
Mon 9 Nov 2026, 07:40
Anything that could put someone at risk
Toe board missing, lift 2, west end
Action taken
Toe board refitted during the inspection
Further action needed
None
Name and position of the person making the report
Priya Shah, scaffold inspector

Schedule 7 in Great Britain and Schedule 8 in Northern Ireland list the same eight particulars.

From Work at Height Regulations 2005, Schedule 7, Work at Height Regulations (Northern Ireland) 2005, Schedule 8 and HSE, Scaffolds.

Record a scaffold inspection

How long do you keep scaffold inspection records?

For a construction platform with a fall of 2 m or more, on site until the construction work is finished, then at an office for 3 months. The clock starts when the work ends, not when the scaffold comes down.

  1. Before the end of the shift the inspector writes the report.
  2. Within 24 hours of finishing the inspection, the inspector gives the report, or a copy, to the person it was done for.
  3. Until the construction work is finished that employer keeps it on site.
  4. Then 3 months at their office.

Paper, a PDF or an app all count. A digital copy must be printable and safe from loss or unauthorised change.

From Work at Height Regulations 2005, regulation 12 and Work at Height Regulations 2005, regulation 2.

Handover certificates and scaffold tags

A handover certificate isn’t a legal requirement. When a competent person inspects the scaffold at handover and records it, that can be the first inspection.

Equipment leaving one firm must go with evidence that its last inspection was done, and a firm receiving equipment must have that evidence before using it. For a scaffold that is usually the handover certificate or the latest report.

Tags are a quick sign on the scaffold. The report is the record.

From Work at Height Regulations 2005, regulation 12 and HSE, Work at height FAQs (construction).

Hand over a scaffold

Scaffold inspection regulations in the UK

The Work at Height Regulations 2005 in Great Britain, and the Work at Height Regulations (Northern Ireland) 2005. HSE’s guidance explains how they apply to scaffolds.

RuleWhere
Inspected after it is put up, before useRegulation 12(2)
Inspected after anything that could affect itRegulation 12(3)
Construction platform with a fall of 2 m or more inspected within 7 days before useRegulation 12(4)
Evidence of the last inspection travels with itRegulation 12(5)
For a construction platform from 2 m, report by end of shift, copy within 24 hours, kept on site then 3 monthsRegulation 12(7) and (8)
What the report containsSchedule 7 (Schedule 8 in Northern Ireland)
Digital recordsRegulation 2(2)
Check before each useRegulation 13
A scaffold not available for use is signed and barred offSchedule 3, paragraph 11

NASC guidance, such as SG35 on handover, is industry practice rather than law.

From Work at Height Regulations 2005, regulation 12, Work at Height Regulations (Northern Ireland) 2005, regulation 12 and HSE, Scaffolds.

Record the next inspection

The eight particulars on your phone, with photos, signed and shared as a PDF.