Scaffold inspection checklist
Inspect it on your phone and issue the report as a PDF. Next week’s inspection starts from this one.
- Free, no account
- Works on one bar of signal
- Blank PDF to print

What goes on a scaffold inspection report
One page the site can read at a glance, with your conclusion largest.
- Which scaffold and whyThe site, which scaffold, its tag, when it was inspected and why. Before first use, weekly, after an alteration or after bad weather.
- Your conclusionSafe to use, safe to use with restrictions, or not to be used, in your words and printed largest with your name.
- Defects and actionWhere, what you found, the action taken and the further action needed, each defect kept together.
- The checksBase, structure, ties, platforms, guardrails, access, loads, sheeting, surroundings and tag. OK, defect or not applicable, with last time’s mark beside each.
- Since the last inspectionWhich checks changed and where the earlier defects stand.
- Who and for whomYour name and position, the firm it was for and their address, and your signature.
The scaffold checklist
Each check takes OK, Defect or N/A. You can add your own.
- Base plates, sole boards and groundFirm, level ground, sole boards sound and big enough, plates central and fully bearing, jacks within limits, no brick packing, settlement or digging nearby
- Tubes, bracing and couplersStandards plumb, ledgers and transoms in, right couplers tight or system locks pinned, bracing complete, no bent, cracked or corroded tubes or fittings
- Ties and anchorsAt the spacing on the design, none removed, fixings sound
- Platforms and boardsFully boarded, boards sound and supported, cannot slip, tip or overhang too far, no trip gaps, inside gap closed or guarded, not slippery, clear of loose materials
- Guardrails, toe boards and brick guardsEvery open side and end, secure, top rail 950 mm or more, no gap over 470 mm
- Ladders, stairs and accessLadders sound, tied, at a safe angle and above the landing, stairs and landings clear to each lift, gates and hatches closing
- Materials, within its load classWithin the duty on the handover, spread out, not stacked at the edge
- Sheeting and nettingOnly as designed and secure, no extra wind load on the ties
- Surroundings, power lines and vehiclesClear of power lines, protected from vehicles, nothing to fall below
- Signs and tagTag shows today's status, closed parts signed and access blocked
Giving the report to the firm
They get the exact report you issued, and never need an account.
- Share the PDFWhatsApp, text or anything else on your phone. They get the file itself.
- Send a link or show a QR codeThey download the exact report with no account, and can sign to say they have seen it. Their signed copy comes back to your phone.
- Print itFor the site file or the scaffold.
When a scaffold must be inspected
The Work at Height Regulations 2005 (regulation 12) ask for an inspection by a competent person in these cases.
- After it is put up, before it is used (paragraph 2).
- At suitable intervals where conditions could make it worse, and after anything that could affect its safety, such as an alteration or bad weather (paragraph 3).
- Where someone could fall 2 metres or more from it during construction work, an inspection in that position within the last 7 days (paragraph 4).
For any inspection of a scaffold or tower used for construction work that someone could fall 2 metres or more from, the inspector writes a report before the end of the working period and gives a copy within 24 hours to whoever the inspection was for (paragraph 7). That firm keeps it at the site until the construction work there is finished, then at its office for 3 months (paragraph 8). For any other inspection under the regulation, the result is recorded and kept until the next one is recorded (paragraph 6). Schedule 7 lists what the report says, and this report prints each of those details. In Northern Ireland they are in Schedule 8 of the Northern Ireland regulations.
Questions
Do I need an account?
No. Inspect it, sign and share the PDF. The report stays on your phone, and the firm you send it to needs only the file or the link.
How does next week’s inspection start from this one?
Pick the scaffold from the list on your phone. Its site, tag and the firm come back, last week’s mark shows beside each check, and open defects are offered back. Nothing counts as checked today until you tap it.
What if there is no signal at the scaffold?
Open the page while you have signal and it gets ready straight away. Then it fills in, signs and makes the PDF without signal. Sending a link waits until you have a bar.
Does the scaffold tag count as the report?
No. The tag shows its status to people at the scaffold. Where someone could fall 2 metres or more during construction work, the written report with the details in Schedule 7 is also needed, and this page makes that report.
Can I issue it with gaps?
Yes. Nothing is required. Before you issue, the page lists what was left blank. A check you did not mark prints Not marked, and a missing conclusion prints Not stated.