Confined Space Entry PermitPermit no.SiteExact locationDetailsContractorValid toIssued toRAMS refValid fromIsolation certThe workSpace and entry pointWork to be doneWhy entry, time limitHazardsOxygen low or highHeatToxic gasDrowningFlammable airRestricted entryEngulfmentPower, machineryPrecautionsDoneBySpace isolated and locked offCleaned, purged and ventilatedAir tested before entry and duringSupervisor and top person namedCommunication agreedRescue plan and equipment readyHarness and lineSafe lighting and toolsBreathing apparatus where neededHow emergency services are calledWhat is isolatedHowLockedTagProved byOther conditionsSign-offNameSignatureDateTimeAuthorised: permit seen before i…Issued: precautions checkedAccepted: permit understoodPage 1 of 2

Choose a design

Confined Space Entry PermitPermit no.SiteExact locationEquipmentGas monitorLightingTripod and winchEscape BARadioTimeO2 %LEL %CO ppmH2S ppmByGas testsPeople in the space: nameCompanyBriefedInOutCancellationAll out atSpace securedEquipment removedHandbackIsolations removedArea returned toNotesSign-offNameSignatureDateTimeExtended: new end timeWork finished: people and tools…Cancelled: area checkedHanded back: area returnedPage 2 of 2

What a permit to work includes

Page 1 of a filled hot work permit, signed to issue and to accept
  1. Work and location
  2. Hazards and precautions
  3. Isolations
  4. Authorisation
  5. Acceptance
  6. ExtensionOn page 2
  7. Cancellation and handbackOn page 2

Hot work, welding, a worked example. HSE sets no fixed form. Its guidance says the company issuing the permit should design it around the site (HSG250).

Permit to work questions

What is a permit to work?

A written, signed go-ahead for a named high-risk job, at one place, for a set time. It says what the hazards are, what must be in place first, and who is responsible. It supports your safe system of work. It does not replace it. HSE: HSG47, HSG250, L101.

When is a permit to work required?

No single rule lists every job. HSE guidance points to one for hot work you cannot avoid, for confined space entry where serious injury is foreseeable, and for high-voltage work. It may suit particularly hazardous digging. Your risk assessment decides. HSE: HSG168, L101, HSR25, HSG47.

Who issues a permit and who accepts it?

A person with clearly assigned authority issues it, after checking the precautions. The person in charge of the work accepts it, confirming they understand the work, the hazards and the precautions. Nobody should issue a permit to themselves. HSE: HSG168, HSG250.

Can one permit cover several days?

Not as an open-ended go-ahead. A permit covers a clearly defined job at one place for a set time. If the job runs on, use the Extended row: check it is still safe and write the new end time. A new shift needs telling what is still open. HSE: HSG168, HSG250.