Permit to dig template

Save to Google Drive or OneDrive
Permit to DigPermit no.SiteExact locationDetailsContractorValid toIssued toRAMS refValid fromDrawing, dateThe workWhere, depth, methodHand dig zoneHazardsElectricityDrains and sewersWater ingressGasDistrict heatingTrafficWaterContaminated groundServices unknownTelecomsUnstable groundPrecautionsDoneByDrawings obtained and datedScanned with locator and signal generatorServices marked on the plan and groundTrial holes hand dugServices exposed and supportedEdge protection and ladders in placeSpoil kept back from the edgeSides supported or batteredInspected at the start of each shiftGas monitoring, traffic managementServices made deadHowLockedTagProved byPeople on this permit: nameCompanyBriefedOther conditionsSign-offNameSignatureDateTimeIssued: precautions checkedAccepted: permit understoodPage 1 of 2

Choose a design

Permit to DigPermit no.SiteExact locationDateTimeByResultExcavation inspectionsCancellationBackfilled or securedServices as foundDrawings marked upHandbackIsolations removedArea returned toNotesSign-offNameSignatureDateTimeExtended: new end timeWork finished: people and tools…Cancelled: area checkedHanded back: area returnedPage 2 of 2

What a permit to work includes

Page 1 of a filled hot work permit, signed to issue and to accept
  1. Work and location
  2. Hazards and precautions
  3. Isolations
  4. Authorisation
  5. Acceptance
  6. ExtensionOn page 2
  7. Cancellation and handbackOn page 2

Hot work, welding, a worked example. HSE sets no fixed form. Its guidance says the company issuing the permit should design it around the site (HSG250).

Permit to work questions

What is a permit to work?

A written, signed go-ahead for a named high-risk job, at one place, for a set time. It says what the hazards are, what must be in place first, and who is responsible. It supports your safe system of work. It does not replace it. HSE: HSG47, HSG250, L101.

When is a permit to work required?

No single rule lists every job. HSE guidance points to one for hot work you cannot avoid, for confined space entry where serious injury is foreseeable, and for high-voltage work. It may suit particularly hazardous digging. Your risk assessment decides. HSE: HSG168, L101, HSR25, HSG47.

Who issues a permit and who accepts it?

A person with clearly assigned authority issues it, after checking the precautions. The person in charge of the work accepts it, confirming they understand the work, the hazards and the precautions. Nobody should issue a permit to themselves. HSE: HSG168, HSG250.

Can one permit cover several days?

Not as an open-ended go-ahead. A permit covers a clearly defined job at one place for a set time. If the job runs on, use the Extended row: check it is still safe and write the new end time. A new shift needs telling what is still open. HSE: HSG168, HSG250.

Is my logo uploaded?

No. It is read and resized on this device and goes only into the files you download, or save to your own Drive or OneDrive. The last design, logo included, is kept in this browser for next time.