Hour by hour site diary template

Save to Google Drive or OneDrive
Site DiaryDateProjectWeatherTimeWhat happened06:0007:0008:0009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00SignedUNCONTROLLED COPY IF PRINTED

Choose a design

Thirteen site diary sheets, daily and weekly

A daily page suits a busy site, where each day needs room for labour, deliveries and delays. A weekly sheet suits a small job, with a few lines a day. Hour by hour suits work that runs to the clock, such as a pour, a crane day or a shutdown.

  • Simple day site diary layout preview

    Simple day

    Work done, who was on site and hold-ups, with room to write

    Use this layout
  • Hour by hour site diary layout preview

    Hour by hour

    A line for each hour, from 06:00 to 22:00

    Use this layout
  • Day with labour site diary layout preview

    Day with labour

    Each trade and its numbers, then the work done

    Use this layout
  • Landscape day site diary layout preview

    Landscape day

    One wide page of work done, with the hours on site

    Use this layout
  • Week at a glance site diary layout preview

    Week at a glance

    Each day’s work, labour and weather across one page

    Use this layout
  • Labour return site diary layout preview

    Labour return

    Each trade’s headcount by day, totalled for the week

    Use this layout

The gate log and the labour return are not diaries: one records the deliveries and visitors at the gate, the other each trade’s numbers across the week.

What a site diary records

A filled site diary page for the day a slab was poured on a house extension
  1. Weather

    Morning and afternoon, with the temperature, so a day lost to rain or wind shows on the page.

  2. Labour

    Each trade, its company, how many were on site and their hours. The labour return adds these up for the week.

  3. Work done

    Each area, then the work carried out there, with the times and quantities, such as a slab’s area and depth.

  4. Deliveries

    The time, what arrived, from whom and the ticket number, so a short load or a late wagon can be traced.

  5. Delays

    What stopped work, when and for how long, and what it cost in hours.

The same page holds the plant on site, the visitors and the instructions received, each with a time and a name. Write it on the day and sign it at the end of the day. A page written up a week later is harder to rely on when a delay or a variation is argued over.

No law names a site diary. A principal contractor must plan, manage and monitor the construction phase (CDM 2015, regulation 13), and a dated page for each day is a plain way to show it.

Three site diary examples

Site diary questions

Is it free?

Yes. There is no account and no email to give. The files are made in your browser.

What should a site diary record?

Who was on site, the weather, the work done, delays and instructions, deliveries, visitors, and any accidents or near misses. Write it on the day, with times.

Daily or weekly site diary?

A daily page suits a busy site, where each day needs room for labour, deliveries and delays. A weekly diary suits a small job, with a few lines a day.

Can I change it after downloading?

Yes. The Excel and Word files open with the same title, boxes and sections, ready to edit. Each prints on A4, and a sheet with more rows runs on to a second page.

Is my logo uploaded?

No. It is read and resized on this device and goes only into the files you download, or save to your own Drive or OneDrive. The last design, logo included, is kept in this browser for next time.

Do I have to keep a site diary?

No law names a site diary. Where there is a principal contractor, CDM 2015 regulation 13 says they must plan, manage and monitor the construction phase. A dated record of each day is a plain way to show it.