Loading and unloading RAMS Builder

Loading and unloading risk assessment and method statement

Prepare RAMS for receiving and unloading deliveries, loading collections, and moving the loads by forklift, telehandler or goods hoist.

  • Free to use
  • No account needed
  • Questions follow HSE guidance
  • Saves in this browser
Prepare the Loading and unloading RAMS

Checking this browser for your work…

Loading and unloading RAMS

What will you be doing?

More details

Pick everything this RAMS covers. The questions that follow are chosen from what you tick here.

Loading and unloading RAMS template

A blank loading and unloading RAMS to fill in: job details, method statement, risk assessment and briefing record.

Risk assessment and method statement

Loading and unloading RAMS

Company
left blank to fill in
Site and work area
left blank to fill in
Planned dates
left blank to fill in
In charge on site
left blank to fill in
Team
left blank to fill in

Method statement

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6

Risk assessment

HazardWho might be harmed and howControls in placeFurther action

Loading and unloading RAMS example

The same RAMS, filled in for one job.

Risk assessment and method statement

Loading and unloading, Unit 3, Canal Side Business Park, Stockport

Company
Hollins & Reed Contracting Ltd
Site and work area
Unit 3, Canal Side Business Park, Stockport
Planned dates
12 to 14 October 2026
In charge on site
Dan Hollins
Team
Two operatives: Dan Hollins leads and checks the area each morning; Priya Shah works with him.

Method statement

  1. 1Set up the work areaConfirm the work area and scope before starting. Keep other people outside the active work area. Keep entrances and escape routes clear.
  2. 2Check the weather before you startStop handling loads when the wind is strong enough to catch them. Stop in heavy rain, ice or lightning, and rest in the shade in hot weather.
  3. 3Agree the delivery planConfirm the carrier, delivery time, receiving person and exact loading point. Agree who controls the move and what happens if the load is unsafe.
  4. 4Set up a clear loading areaUse a designated, lit area away from traffic and people not needed for the move. Keep the route to the set-down place clear.
  5. 5Check the load before openingLook from the ground for movement, damage or a load leaning against the restraint. Do not release a restraint if the load could move or fall.
  6. 6Make the vehicle stablePark on firm, level ground where the loading method allows it. Apply the brakes and use the vehicle or trailer stabilisers.
  7. 7Hold the vehicle until it is safeKeep the driver in the agreed safe place while loading or unloading. Do not let the vehicle move until the person in charge says the area is clear.
  8. 8Get on and off the bed safelyWork from the ground where you can and reach in rather than climbing on the load. Use the steps, ladder or tail lift; never jump down from the bed.
  9. 9Clear and hand back the areaRemove tools, waste and unused materials. Check the area is clean and ready to use. Tell the person in charge when the work is complete.

Risk assessment

  • People entering the work area or tripping over materials

    Workers, occupants and visitors

    Mark or barrier the active work area. Store tools and materials away from access routes.

  • Wind catches the loads and blows them onto people nearby

    The team and people nearby

    Check the forecast each morning and agree when the wind stops the work. Tie down or take in loose materials before you leave.

  • People enter an unplanned loading area or the parties work to different instructions

    The driver, site team and visitors

    Exchange the route, loading method and site rules before arrival. Stop the delivery if a significant safety issue cannot be agreed.

  • A person is struck by the vehicle, machine or load during loading

    The driver, loading team and pedestrians

    Barrier or marshal the area before loading starts. Keep non-essential people and vehicles outside it.

  • A shifted load falls when a strap, door or tailboard is released

    The driver and people loading or unloading

    Ask the driver to keep clear while the load is checked. Agree a new safe method for a shifted or damaged load.

  • The vehicle or trailer moves or tips while a load is transferred

    The driver and loading team

    Keep the vehicle still until the person in charge releases it. Do not load or unload where the ground or deck cannot support the arrangement.

  • The vehicle drives away while a person or machine is still beside it

    The driver, loading team and people nearby

    Keep the keys or paperwork with the person in charge where needed. Use a clear handover signal before the vehicle moves.

  • A person falls from the vehicle bed or a load falls over the edge

    The people loading or unloading

    Nobody stands on top of a load to load or unload it. Keep feet and loads back from the open edge of a tail lift.

  • Debris, tools or unfinished work left in the area

    Workers, occupants and visitors

    Remove waste by the agreed route. Record and protect any unfinished work.

What a Loading and unloading RAMS covers

Receiving and unloading deliveries or loading collections, and moving loads with a forklift, telehandler or installed hoist. Not covered: crane and lorry-loader lifts.

  • Receive/unload
  • Forklift use
  • Telehandler interface
  • Temporary hoist use

Suggested steps and hazards for Loading and unloading

Suggested for receive/unload before any questions are answered.

  1. Agree the delivery plan

    • Confirm the carrier, delivery time, receiving person and exact loading point.
    • Agree who controls the move and what happens if the load is unsafe.

    Hazard

    People enter an unplanned loading area or the parties work to different instructions

    Who might be harmed and how

    The driver, site team and visitors

    Controls in place

    • Exchange the route, loading method and site rules before arrival.
    • Stop the delivery if a significant safety issue cannot be agreed.

    A shared delivery plan keeps the carrier and site team working to one arrangement.

    HSE: Delivering safely
  2. Set up a clear loading area

    • Use a designated, lit area away from traffic and people not needed for the move.
    • Keep the route to the set-down place clear.

    Hazard

    A person is struck by the vehicle, machine or load during loading

    Who might be harmed and how

    The driver, loading team and pedestrians

    Controls in place

    • Barrier or marshal the area before loading starts.
    • Keep non-essential people and vehicles outside it.

    A controlled loading area keeps the vehicle, load and pedestrians apart.

    HSE: Delivering safely
  3. Check the load before opening

    • Look from the ground for movement, damage or a load leaning against the restraint.
    • Do not release a restraint if the load could move or fall.

    Hazard

    A shifted load falls when a strap, door or tailboard is released

    Who might be harmed and how

    The driver and people loading or unloading

    Controls in place

    • Ask the driver to keep clear while the load is checked.
    • Agree a new safe method for a shifted or damaged load.

    Checking the load before opening prevents a shifted load falling on people.

    HSE: Safe driving: loading and unloading

What the builder asks about Loading and unloading

Your answers decide which steps, hazards and controls it suggests.

The job

  • Is this delivery coming in, going out, or both?
  • How heavy and how big is it?
  • What will the telehandler do?
  • Which forklift and load arrangement will you use?
  • What is coming to site?

Where

  • Where will it land?
  • Where will the vehicle and load be kept clear?

How it’s done

  • What will you stand on to reach the work?
  • Which machine, forks and load chart will you use?
  • How will the landings and load be controlled?
  • Can people and vehicles be kept clear?
  • How will people be kept away from the truck?
  • How will the loads come off or go on?
  • Who will be about?

What your Loading and unloading RAMS includes

Method statement

The work in order, step by step.

Risk assessment

Each hazard, who could be harmed, the controls in place and any further action.

PDF

The method statement and risk assessment in one A4 PDF.

What the law asks for

What a RAMS is

A risk assessment and method statement. The risk assessment records what could cause harm on the job, who could be harmed and how, and the controls that keep the risk down. The method statement sets out how the work will be done, step by step, in the order it happens.

A client or main contractor will usually ask for one before you start. RAMS is a site term, not a legal one: the law asks for the risk assessment and for the work to be planned, and a method statement is the usual way to show that plan for one job.

What the law asks for

  • Employers, and self-employed people doing construction work, must make a suitable and sufficient assessment of the risks to their own people and to anyone else affected by the work (Management of Health and Safety at Work Regulations 1999, regulation 3).
  • An employer with five or more employees must record the significant findings. The assessment must be reviewed if there is reason to think it is no longer valid, or the work has changed significantly.
  • Every contractor must plan, manage and monitor its work so that, so far as is reasonably practicable, it is done without risks to health and safety, and must give its workers the information and instructions they need, including the hazards the risk assessment found (Construction (Design and Management) Regulations 2015, regulation 15).

HSE guidance: the steps to manage risk and what contractors must do under CDM. This is the law in Great Britain; Northern Ireland has its own equivalent regulations.

What the builder does

You choose the work and answer questions about how the job will be done, such as what you will stand on and what else is going on nearby. Your answers decide which steps, hazards and controls it suggests.

Many suggestions link to the HSE guidance they draw on. Your work is kept in this browser, and the PDF is made on your device.

Separate documents

A COSHH assessment, lifting plan, permit to work, asbestos survey and the principal contractor’s construction phase plan are separate from the RAMS.