Drilling RAMS Builder
Drilling risk assessment and method statement
Checking this browser for your work…
RAMS review
Check a RAMS
Drilling RAMS template
A blank drilling RAMS to fill in: job details, method statement, risk assessment and briefing record.
Risk assessment and method statement
Drilling RAMS
- Company
- left blank to fill in
- Site and work area
- left blank to fill in
- Planned dates
- left blank to fill in
- In charge on site
- left blank to fill in
- Team
- left blank to fill in
Method statement
- 1
- 2
- 3
- 4
- 5
- 6
Risk assessment
| Hazard | Who might be harmed and how | Controls in place | Further action |
|---|---|---|---|
Drilling RAMS example
The same RAMS, filled in for one job.
Risk assessment and method statement
Drilling, First floor offices, Albion House, Manchester
Risk assessment
People entering the work area or tripping over materials
Workers, occupants and visitors
Mark or barrier the active work area. Store tools and materials away from access routes.
A wrong bit snatches, breaks or makes uncontrolled dust
The person using the tool and people nearby
Use the material and route information before drilling. Hold the drill with both hands and use its side handle.
Breathing asbestos fibres from old boards, sheets, sealants or insulation
The team and anyone in the building
Do not cut, drill or break any material until it is confirmed asbestos free. Licensed work is not for this method; hand it to a licensed contractor.
Hitting a live cable or gas pipe causes shock, fire or gas escape
The person doing the work and everyone nearby
Check again wherever the work moves. If you hit something, stop, keep clear and report it.
Falling from the access equipment; tools or materials falling from the platform
The person on the platform, if it is set up on an unsuitable surface and shifts under them. Anyone passing or working underneath.
Place access equipment on a firm, level surface. Keep tools and materials secure while working above ground.
Hand-arm vibration from the hammer drill
The person drilling
Keep the tools maintained and hands warm. Gloves do not stop vibration. Give health checks to anyone above the action value.
Silica or board dust escaping into the room
Fixers and anyone nearby
Check the hose and bag before starting. Keep the hose connection tight and secure.
Silica and board dust from power cutting damage the lungs
The person cutting and anyone downwind
Use the kit that fits the tool. Cut in one place, away from other trades. Collect any slurry while it is wet. Clear any dry dust with an H or M Class vacuum, not a brush.
Silica dust if the water stops, and slipping on slurry
The person cutting and anyone nearby
Stop cutting if the water stops.
A disc bursts or the tool kicks back and cuts the user
The person cutting
Only someone trained to change discs fits them. Stop and swap any cracked or worn disc.
Hearing damage and hand-arm vibration from power tools
The person cutting
Use sharp blades and discs, which cut faster with less vibration. Warn people nearby before you start cutting.
Settled dust becoming airborne during clean-up
Fixers and other trades
Keep people clear until the area is clean. Use the tool vacuum or wet cleaning.
Debris, tools or unfinished work left in the area
Workers, occupants and visitors
Remove waste by the agreed route. Record and protect any unfinished work.
Drilling, First floor offices, Albion House, Manchester
- Company
- Hollins & Reed Fit-out Ltd
- Site and work area
- First floor offices, Albion House, Manchester
- Planned dates
- 12 to 14 October 2026
- In charge on site
- Dan Hollins
- Team
- Two operatives: Dan Hollins leads and checks the area each morning; Priya Shah works with him.
Method statement
- 1Set up the work areaConfirm the work area and scope before starting. Keep other people outside the active work area. Keep entrances and escape routes clear.
- 2Choose and check the power toolConfirm the agreed hole, chase or cut and choose the power tool and bit or disc for the material. Check the tool, its lead or battery, the bit and the guard before use, and keep people who are not needed away.
- 3Check for asbestos before you disturb anythingCheck the asbestos survey covers exactly what you will disturb, to the full depth. Register only, or nothing: get a refurbishment survey or a sample first. Read what it says about old boards, coatings, ceiling voids and linings. No survey, or a material you do not recognise: stop and get it checked.
- 4Find and isolate hidden servicesFind cables and pipes before you disturb anything: drawings, then a detector. Mark what you find. Not sure what is there? Turn the supply off, or do not start. Have cables and gas isolated by the right person and prove them dead before you start.
- 5Set up access equipmentUse access equipment suited to the task and work area. Check the equipment before use. Keep the area below the work controlled.
- 6Assess vibration from the hammer drillNote how long each person's hands are on each tool while it runs. Take the tool's vibration figure from the maker or HSE's table and check it fits how you use it. Points per hour times hours on the trigger, added up for the day, gives the exposure: 100 points is the action value, 400 is the limit. HSE's vibration calculator does the sum. Over 100, cut it with lower-vibration kit or less time, and never pass 400. Write the result down. Sharing the work does not replace this.
- 7Connect dust captureFit the hood or collector made for the tool and connect the M- or H-class vacuum. Keep the vacuum running while the tool cuts and stop if collection fails.
- 8Control the dust when cuttingNever cut dry in the open. Wear an APF 20 mask (FFP3 or P3) when you cut: fit tested and clean-shaven. Keep other people out of the dust.
- 9Wet cuttingThis job is wet cutting: keep water on and collect the slurry.
- 10Use the grinder or disc cutter safelyCheck the disc is the right type and speed for the tool and the material. Keep the guard on and both hands on the tool. Wear impact-rated eye protection.
- 11Limit noise and vibrationWear ear defenders when cutting. Note how long each person's hands are on each tool while it runs. Take the tool's vibration figure from the maker or HSE's table and check it fits how you use it. Points per hour times hours on the trigger, added up for the day, gives the exposure: 100 points is the action value, 400 is the limit. HSE's vibration calculator does the sum. Over 100, cut it with lower-vibration kit or less time, and never pass 400. Write the result down. Sharing the work does not replace this. Keep the tools maintained.
- 12Clean without making dustVacuum or wet-brush the area as you work. Do not dry sweep settled dust.
- 13Clear and hand back the areaRemove tools, waste and unused materials. Check the area is clean and ready to use. Tell the customer or whoever runs the site when the work is complete.
What a drilling RAMS covers
Drilling, chasing and cutting masonry with handheld tools, and diamond core drilling through walls and floors. Not covered: breaking out concrete with a breaker.
- Handheld drill/chase/cut
- Core drill
Suggested steps and hazards for drilling
Suggested for handheld drill/chase/cut before any questions are answered.
Choose and check the power tool
- Confirm the agreed hole, chase or cut and choose the power tool and bit or disc for the material.
- Check the tool, its lead or battery, the bit and the guard before use, and keep people who are not needed away.
Hazard
A wrong bit snatches, breaks or makes uncontrolled dust
Who might be harmed and how
The person using the tool and people nearby
Controls in place
- Use the material and route information before drilling.
- Hold the drill with both hands and use its side handle.
The right bit and a checked route keep drilling controlled.
COSHH essentials: CN3: Drilling with hand-held rotary tools Assess vibration from the hammer drill
- Note how long each person's hands are on each tool while it runs. Take the tool's vibration figure from the maker or HSE's table and check it fits how you use it. Points per hour times hours on the trigger, added up for the day, gives the exposure: 100 points is the action value, 400 is the limit. HSE's vibration calculator does the sum. Over 100, cut it with lower-vibration kit or less time, and never pass 400. Write the result down. Sharing the work does not replace this.
Hazard
Hand-arm vibration from the hammer drill
Who might be harmed and how
The person drilling
Controls in place
- Keep the tools maintained and hands warm. Gloves do not stop vibration.
- Give health checks to anyone above the action value.
Time on the tool decides the harm, so it has to be measured against the tool that is actually used.
Construction physical ill health risks: Vibration Connect dust capture
- Fit the hood or collector made for the tool and connect the M- or H-class vacuum.
- Keep the vacuum running while the tool cuts and stop if collection fails.
Hazard
Silica or board dust escaping into the room
Who might be harmed and how
Fixers and anyone nearby
Controls in place
- Check the hose and bag before starting.
- Keep the hose connection tight and secure.
Capture at the tool stops dust spreading through the room.
COSHH essentials: CN3: Drilling with hand-held rotary tools
What the builder asks about drilling
Your answers decide which steps, hazards and controls it suggests.
The job
- What are you coring through?
- What will you use the tool for?
- How is the coring machine held?
- What are you drilling or cutting into?
- Which way does the hole go?
Where
- Is the building older than the year 2000? Older buildings can have asbestos in them.
- What pipes or cables run behind or through the wall, floor or ceiling?
How it’s done
- What will you stand on to reach the work?
- How will you keep the dust down?
- How will you control the water or dust?
- Will you cut anything on site, and with what?
- How will the materials and equipment get to the work?
What your drilling RAMS includes
Method statement
The work in order, step by step.
Risk assessment
Each hazard, who could be harmed, the controls in place and any further action.
The method statement and risk assessment in one A4 PDF. Your logo on Pro and Team.
What the law asks for
What a RAMS is
A risk assessment and method statement. The risk assessment records what could cause harm on the job, who could be harmed and how, and the controls that keep the risk down. The method statement sets out how the work will be done, step by step, in the order it happens.
A client or main contractor will usually ask for one before you start. RAMS is a site term, not a legal one: the law asks for the risk assessment and for the work to be planned, and a method statement is the usual way to show that plan for one job.
Learning to write one
The RAMS guide works through one trench job. It shows how to say which job it covers, name who each step could harm and put each control before the work it protects.
What the law asks for
- Employers, and self-employed people doing construction work, must make a suitable and sufficient assessment of the risks to their own people and to anyone else affected by the work (Management of Health and Safety at Work Regulations 1999, regulation 3).
- An employer with five or more employees must record the significant findings and any group of employees it finds especially at risk. The assessment must be reviewed if there is reason to think it is no longer valid, or the work has changed significantly.
- Every contractor must plan, manage and monitor its work so that, so far as is reasonably practicable, it is done without risks to health and safety, and must give its workers the information and instructions they need, including the hazards the risk assessment found (Construction (Design and Management) Regulations 2015, regulation 15).
HSE guidance: the steps to manage risk and what contractors must do under CDM. This is the law in Great Britain; Northern Ireland has its own equivalent regulations.
What the builder does
You choose the work and answer questions about how the job will be done, such as what you will stand on and what else is going on nearby. Your answers decide which steps, hazards and controls it suggests.
Many suggestions link to the HSE guidance they draw on. Your work is kept in this browser and, signed in, on your account with its photos; the PDF is made on your device. A briefing you send to phones goes through your account.
Separate documents
A COSHH assessment, lifting plan, permit to work, asbestos survey and the principal contractor’s construction phase plan are separate from the RAMS.
Reviewing a RAMS before work starts
RAMS review reads a RAMS PDF, yours before you send it or one a subcontractor sends you, and lists the points to raise, each marked on the page it comes from. Quick reviews are free.